COSHH by substance · UK
Bentonite COSHH assessment
A cement COSHH reused for mud misses silica in some powders, the public at a pit, and that returns are waste, not a gully filler.
What this assessment usually covers
- SDS silica line read
- Mix without a cloud
- Frac-out plan
- Returns as waste
- Pits guarded
- No gully discharge
Quick answer
A bentonite COSHH assessment covers mixing and circulating drilling fluid on directional drill, piling or diaphragm-wall jobs. Dust when mixing dry, slips on wet fluid, and frac-out into a cellar or brook are typical. An SDS is not a COSHH assessment.
Primary topic: bentonite coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Cement COSHH reused
Wrong dust, no frac-out.
Fluid to the kerb gully
Pollution.
SDS PDF as COSHH
No mix task.
What to get right on this document
Returns are waste
Not a gully.
Dry mix is the dust task
Assess bagging.
SDS informs COSHH
It is not COSHH.
What this document has to cover
A cement COSHH reused for mud misses silica in some powders, the public at a pit, and that returns are waste, not a gully filler.
A bentonite coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Inhalable dust when slinging dry powder (silica content — read the SDS)
- Slips on wet bentonite
- Skin and eye irritation
- Frac-out / spill to cellars, drains and watercourses
- Contaminated returns as waste
- Public at an open pit of fluid
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Prefer pre-hydrated or enclosed mix if available
- Mix to minimise the cloud; RPE as assessed when bag-emptying
- Contain fluid; frac-out plan; legal disposal of returns
- Guard pits; exclude the public
- Wash facilities; do not track mud into occupied shops
- Do not discharge to a surface-water drain
Occupancy and other people
Urban streets have cellars and shop floors on the bore path. Mud in a basement is occupancy.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Bentonite powder / slurry
- Polymers if in the mix
- Spoiled returns (waste)
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer bentonite coshh assessment document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- RAMS by jobDirectional drilling RAMSCreate a directional drilling rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- COSHH by substanceDiesel COSHH assessmentDraft a coshh assessment for diesel for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSilica dust COSHH assessmentDraft a silica dust coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceCement COSHH assessmentDraft a cement coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceR32 refrigerant COSHH assessmentDraft a r32 coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent adhesive COSHH assessmentDraft a solvent adhesive coshh for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent-based paint COSHH assessmentDraft a solvent paint coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
All coshh by substance · RAMS by trade · Free RAMS generator
Questions
- Is bentonite just clay?
- Still assess dust, silica if present, and pollution.
- Is an SDS enough?
- No.
- Directional-drilling RAMS?
- Attach this COSHH.
- Polymer mix instead?
- Read that SDS — still a fluid and a waste.