Method statement · UK
Tiling method statement
Dry cutting in a mall corridor is the failure mode.
Typical scope
- Wet cut
- Phased WC
- Slurry drums
- Slip control
- Sharps
- Handover
Quick answer
A tiling method statement is the sequence for cutting, bedding and grouting on a named site. Silica, slips and slurry disposal should be impossible to skip.
Primary topic: tiling method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Dry cut
Silica.
Drain slurry
Pollution.
All WCs closed
No phase.
Example
Night retile
Built from one job description. You review and adjust every item before issuing it.
Job description
Public washroom, one side live, wet cutting bay.
Activities identified
- General site work
- Power tools
- Occupied premises or public areas
Method (6 steps)
- 1.Arrive and sign in. Arrive at Shopping centre WC, report to the Centre FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Centre FM site contact, report anything outstanding and sign out.
Main risks (3 in total)
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
What to get right on this document
Suppression
Silica.
Phase
One facility live.
Drums
Not drains.
What this document has to cover
Dry cutting in a mall corridor is the failure mode.
A tiling method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Silica
- Slips
- Sharps
- Public WCs
- Slurry pollution
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Phase the room
- Cut with suppression
- Bed tiles
- Grout
- Collect slurry
- Reopen when slip-free
Occupancy and other people
Keep one WC live in public buildings unless a full close is agreed.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Adhesives
- Grout
- Slurry
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer tiling method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeTiling RAMSSite-specific tiling RAMS: cutting silica, adhesives, slips and public washrooms.
- GuidesRAMS vs method statementHow the risk assessment and method statement fit together, and when clients ask for a combined RAMS. Practical UK guidance for contractors — with links to free tools.
- RAMS by jobBathroom refurbishment RAMSCreate a bathroom refurbishment rams for a named UK site. Suggested risks and method steps you review before download or issue.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- Large format?
- Suction lifters in the method.
- Floor levelling?
- Add compound COSHH.
- Electric cutters?
- Guards and RCD.
- Epoxy grout?
- Different COSHH.