Tiling RAMS

Cut stations in corridors and wet floors in public WCs are how tiling RAMS fail audits.

Typical scope

  • Cut controls
  • Phased WC
  • Slurry disposal
  • Slip management
  • Sharps waste
  • After-hours if needed

Quick answer

A tiling RAMS is a site-specific pack for floor and wall tiling. Cutting silica, wet adhesives, and keeping washrooms usable are the usual critical controls.

Primary topic: tiling rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Dry cutting in the mall

    Silica cloud.

  • All WCs closed

    No phase.

  • Slurry down the drain

    Illegal.

Example

Centre washroom retile

Built from one job description. You review and adjust every item before issuing it.

Job description

Retile the west washroom at Victoria Centre, Nottingham, nights. East washroom stays open, wet cutting in a boxed bay, slurry in drums.

Activities identified

  • General site work
  • Power tools
  • Lone working

Method (5 steps)

  1. 1.Arrive and sign in. Arrive at Victoria Centre, Nottingham, report to the Victoria Centre FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
  4. 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  5. 5.Hand over and sign out. Hand over to the Victoria Centre FM site contact, report anything outstanding and sign out.

Main risks (3 in total)

Hand and power tools

Residual Low

Who: Operatives

  • Battery or 110V tools used; no 230V tools on site without RCD protection
  • Tools inspected before use and PAT tested where applicable
  • Guards fitted and used as designed
  • Eye protection and gloves suitable for the task

Noise and hand-arm vibration

Residual Medium

Who: Operatives, people nearby

  • Low-vibration, low-noise tools selected
  • Trigger times limited and rotated between operatives
  • Noisy work scheduled to reduce disruption to occupants
  • Hearing protection worn where noise is high

Lone working

Residual Low

Who: Lone operatives

  • Higher-risk tasks (work at height, live work, confined spaces) not carried out alone
  • Check-in procedure agreed with the office at set times
  • Mobile phone charged and signal checked on arrival

What to get right on this document

Water or extract

Silica is foreseeable.

Keep a WC open

Or agree a full close.

Slurry is waste

Not a drain cleaner.

What this document has to cover

Cut stations in corridors and wet floors in public WCs are how tiling RAMS fail audits.

A tiling rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Silica from cutting tiles
  • Wet adhesive slips
  • Kneeling and cuts
  • Public in washrooms
  • Manual handling of packs
  • Waste sharps

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Phase which WC stays open
  • Cut with water suppression or extract, not in the corridor
  • Set out, adhesive, tile
  • Grout, clean, dispose of slurry legally
  • Reopen when slip-free
  • Handover

Occupancy and other people

Shopping-centre toilets need at least one facility live. Write the phase.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Cement adhesives
  • Grout
  • Silica slurry

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer tiling rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by trade · RAMS by trade · Free RAMS generator

Questions

Porcelain vs ceramic?
Harder cutting — more silica control.
Do I need COSHH for grout?
Yes.
Floor only?
Same slips and silica.
Large format?
Add handling and suction lifters.