Method statement · UK
Open highway cut method statement
A trial-hole method never names the remaining lane and night-work occupancy. Put this hold point first: traffic management and excavation support before the first cut — occupancy is part of the method, not a footnote.
Typical scope
- Traffic management and excavation support before the first cut as a hold point
- The remaining lane and night-work occupancy written
- Exclusion that holds
- Restore in the dutyholder’s order
- Named abort
- Review before issue
Quick answer
A open highway cut method statement is the sequence for open-cut crossing of a live highway on a named UK site. The hold point is traffic management and excavation support before the first cut. If someone new cannot brief the remaining lane and night-work occupancy from this method, it is not finished.
Primary topic: open highway cut method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
trial-hole method reused
No traffic management and excavation support before the first cut.
Hold point buried
The remaining lane and night-work occupancy is a step.
Occupancy ignored
The remaining lane and that a night driver will ignore cones.
Example
Open highway cut sequence on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Open-cut crossing of a live highway. Hold point: traffic management and excavation support before the first cut. the remaining lane and night-work occupancy. the remaining lane and that a night driver will ignore cones.
Activities identified
- General site work
- Power tools
- Excavation
- Lone working
Method (8 steps)
- 1.Arrive and sign in. Arrive at Named UK site on the pack, report to the Dutyholder on the pack site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
- 4.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 5.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
- 6.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
- 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 8.Hand over and sign out. Hand over to the Dutyholder on the pack site contact, report anything outstanding and sign out.
Main risks (5 in total)
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
Excavation collapse and falls into excavations
Residual MediumWho: Operatives, public
- Excavations battered back or supported (trench boxes/shoring) where people enter
- Spoil and plant kept away from the edge
- Edge protection and barriers around open excavations
- Excavations inspected at the start of each shift by a competent person
Striking buried services
Residual MediumWho: Operatives, public
- Service drawings obtained before digging
- Area scanned with a CAT and Genny by a trained operator; services marked
- Trial holes dug by hand near located services (safe digging practice)
+ 1 more risks in the full RAMS.
What to get right on this document
Hold point first
Put this hold point first: traffic management and excavation support before the first cut.
Name the site facts
The remaining lane and night-work occupancy
People who did not read it
Roads stay open around you
What this document has to cover
A trial-hole method never names the remaining lane and night-work occupancy. Put this hold point first: traffic management and excavation support before the first cut — occupancy is part of the method, not a footnote.
An open highway cut method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Vehicle impact on an open cut
- Collapse of the excavation
- Buried service strike
- Public at an unlit crossing
- Plant reversing in a live lane
- Restore without a running surface
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- TM in place; remaining lane written
- Locate services; support the excavation
- Cut; no unguarded hole at shift change
- Make the crossing
- Restore the running surface
- Take TM down only when safe
Occupancy and other people
Roads stay open around you. Write the remaining lane and that a night driver will ignore cones as a method step.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances actually used on this sequence
- Cleaning agents of the protocol
- Residues you open
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer open highway cut method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobOpen highway crossing RAMSCreate a open highway crossing rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- GuidesHow to write a method statementA practical sequence for writing a method statement that a principal contractor will actually read.
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- Is this instead of the open highway cut RAMS?
- No — it is the occupancy and sequence layer the job RAMS must include or attach.
- Can we skip traffic management and excavation support before the first cut?
- No. Traffic management and excavation support before the first cut is why this method exists.
- Who owns the remaining lane and night-work occupancy?
- The dutyholder named on the method. A poster is not a brief.
- Can AI issue this method?
- A tool can draft a open highway cut method. A competent person reviews it for this site.