Method statement · UK
MEWP on highway method statement
Car-park MEWP methods miss cellars, kerbs and shoppers behind the machine.
Typical scope
- Ground survey
- Licence
- Banksman
- Pads
- Overheads
- Reopen pavement
Quick answer
A MEWP-on-highway method statement is the sequence for using a boom or scissor next to the public. Ground assessment, licence, pads and a banksman should appear before the basket goes up.
Primary topic: mewp on highway method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
No pads
Cellar.
No banksman in a crowd
Crush.
No licence
Illegal occupation.
Example
Fascia from a boom
Built from one job description. You review and adjust every item before issuing it.
Job description
High street sign swap, pavement licence, pads, banksman, shop open.
Activities identified
- General site work
- Occupied premises or public areas
Method (5 steps)
- 1.Arrive and sign in. Arrive at High street pavement, report to the Retailer site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 5.Hand over and sign out. Hand over to the Retailer site contact, report anything outstanding and sign out.
Main risks (1 in total)
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
What to get right on this document
Survey ground
Cellars/kerbs.
Named banksman
Public.
Licence in the pack
Before arrival.
What this document has to cover
Car-park MEWP methods miss cellars, kerbs and shoppers behind the machine.
A mewp on highway method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Overturn
- Crushing public
- Traffic
- Overheads
- Falls
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Licence and ground check
- TM/pedestrian management
- Position with banksman and pads
- Harness/lanyards as required
- Work
- Demobilise and reopen
Occupancy and other people
Shoppers walk behind you. The banksman is the control.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Hydraulic oil
- Diesel
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer mewp on highway method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobMEWP on the public highway RAMSCreate a mewp pavement rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- RAMS by tradeScaffolding RAMSCreate scaffolding rams online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWorking at height in RAMSHow to describe access equipment, fragile surfaces and rescue thinking inside a RAMS. Practical UK guidance for contractors — with links to free tools.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- IPAF?
- Usual competence evidence.
- Scissor on a slope?
- Manufacturer limits.
- Wind?
- Street canyons still count.
- As a crane?
- No unless designed.