MEWP on the public highway RAMS
A rooftop MEWP RAMS that never mentions a pavement licence, banksman or live traffic is unsafe on the street.
Typical scope
- Ground assessment
- Pavement licence
- Banksman
- Outrigger pads
- Public exclusion
- Overheads check
Quick answer
A MEWP-on-pavement RAMS covers using a boom or scissor next to live traffic and pedestrians. Overturn, crushing, and public interface are the critical harms.
Primary topic: mewp pavement rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Car-park MEWP RAMS reused
No highway content.
No pads
Cellar roofs.
Operator as their own banksman in a crowd
Crushing.
Example
Shopfront sign from a boom
Built from one job description. You review and adjust every item before issuing it.
Job description
Replace a fascia sign at 22 High Street, Chester, from a 3b boom. Pavement licence, pedestrian management, pads over suspected cellar, banksman, shop remaining open.
Activities identified
- General site work
- Roof work
- Manual handling
- Occupied premises or public areas
Method (9 steps)
- 1.Arrive and sign in. Arrive at 22 High Street, Chester, report to the High Street Retail Ltd site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Set up exclusion zone below. Establish an exclusion zone below the work area with barriers and signage before any work at height starts.
- 5.Access the roof. Access the roof via the agreed route. Confirm edge protection is in place and identify any fragile areas before moving onto the roof.
- 6.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 7.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 8.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 9.Hand over and sign out. Hand over to the High Street Retail Ltd site contact, report anything outstanding and sign out.
Main risks (6 in total)
Fall from roof edge
Residual MediumWho: Operatives
- Plan work to be done from below or from a MEWP where possible
- Edge protection (guard rails) or parapet of adequate height in place before work starts
- Safe access route to the roof agreed with the site; roof hatch secured open
- Where collective protection isn't possible, use a fall-restraint system with suitable anchors
- Work stops in high winds, ice or heavy rain
Fall through fragile roof or rooflight
Residual MediumWho: Operatives
- Treat all roof sheets and rooflights as fragile unless confirmed otherwise by the site
- Rooflights covered or protected with suitable mesh or barriers
- Staging or crawling boards used; no walking directly on sheets
- Safety netting or fall arrest below where required
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Adverse weather
Residual LowWho: Operatives
- Forecast checked before work; work at height stopped in high winds
- Breaks, water and shade in hot weather; warm clothing in cold
- Sun protection on exposed work in summer
+ 2 more risks in the full RAMS.
What to get right on this document
Survey the ground
Cellars, ducts, kerbs.
Someone watches the public
Named banksman.
Licence in the pack
Not in a van somewhere.
What this document has to cover
A rooftop MEWP RAMS that never mentions a pavement licence, banksman or live traffic is unsafe on the street.
A mewp pavement rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Overturn from kerbs, cellars or street furniture
- Crushing pedestrians against walls
- Struck by passing vehicles
- Falls from the platform
- Overhead lines and shopfronts
- Noise and dust affecting the public
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm licence, ground survey and overheads
- Set TM / pedestrian management before the machine arrives
- Position with a banksman; outriggers on pads
- Harness as the machine requires; tools lanyarded
- Work the elevation; stop if the public breach the exclusion
- Demobilise, reopen the pavement, inspect the machine out
Occupancy and other people
Shopfronts stay open. Pedestrians will walk behind you. A spotter is often the control that matters.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Hydraulic oil
- Diesel if used
- None else typically
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer mewp pavement rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeScaffolding RAMSCreate scaffolding rams online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsScaffolding method statementWrite a scaffolding method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Scissor vs boom?
- Write the actual machine — crush and outreach differ.
- Do I need IPAF?
- Competence is required; IPAF is the usual evidence.
- Can I use the MEWP as a crane?
- Not unless designed for it — tools only.
- Wind?
- Manufacturer limits on a street canyon still apply.