Hoarding footway method statement

A heras method never names which footway stays open and wind on sheets. Put this hold point first: a remaining-footway and lighting plan before the first sheet is stood — occupancy is part of the method, not a footnote.

Typical scope

  • A remaining-footway and lighting plan before the first sheet is stood as a hold point
  • Which footway stays open and wind on sheets written
  • Exclusion that holds
  • Restore in the dutyholder’s order
  • Named abort
  • Review before issue

Quick answer

A hoarding footway method statement is the sequence for erecting hoarding on a live street on a named UK site. The hold point is a remaining-footway and lighting plan before the first sheet is stood. If someone new cannot brief which footway stays open and wind on sheets from this method, it is not finished.

Primary topic: hoarding footway method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • heras method reused

    Missing: a remaining-footway and lighting plan before the first sheet is stood.

  • Hold point buried

    Which footway stays open and wind on sheets is a step.

  • Occupancy ignored

    The remaining footway and that a buggy will take the vehicle lane.

Example

Hoarding footway sequence on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Erecting hoarding on a live street. Hold point: a remaining-footway and lighting plan before the first sheet is stood. which footway stays open and wind on sheets. the remaining footway and that a buggy will take the vehicle lane.

Activities identified

  • General site work
  • Electrical isolation

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Named UK site on the pack, report to the Dutyholder on the pack site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  4. 4.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  5. 5.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Dutyholder on the pack site contact, report anything outstanding and sign out.

Main risks (1 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

What to get right on this document

Hold point first

Put this hold point first: a remaining-footway and lighting plan before the first sheet is stood.

Name the site facts

Which footway stays open and wind on sheets

People who did not read it

High streets stay busy

What this document has to cover

A heras method never names which footway stays open and wind on sheets. Put this hold point first: a remaining-footway and lighting plan before the first sheet is stood — occupancy is part of the method, not a footnote.

A hoarding footway method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Sheet in wind striking the public
  • Vehicle impact on an open post hole
  • Blocked shop escape
  • Buggy taking the vehicle lane
  • Unlit hoarding at night
  • Buried services in post holes

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Agree the footway and lighting with the highway authority
  • Locate services; close the working bay
  • Stand sheets with a wind limit; brace as designed
  • Light and sign the remaining footway
  • Daily inspect
  • Handover residual open bays

Occupancy and other people

High streets stay busy. Write the remaining footway and that a buggy will take the vehicle lane as a method step.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances actually used on this sequence
  • Cleaning agents of the protocol
  • Residues you open

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer hoarding footway method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All method statements · RAMS by trade · Free RAMS generator

Questions

Is this instead of the hoarding footway RAMS?
No — it is the occupancy and sequence layer the job RAMS must include or attach.
Can we skip a remaining-footway and lighting plan before the first sheet is stood?
No. A remaining-footway and lighting plan before the first sheet is stood is why this method exists.
Who owns which footway stays open and wind on sheets?
The dutyholder named on the method. A poster is not a brief.
Can AI issue this method?
A tool can draft a hoarding footway method. A competent person reviews it for this site.