Concrete works method statement
If washout is not a numbered step, it will happen in a gully.
Typical scope
- Wagon plan
- Pump exclusion
- Washout bay
- PPE
- Weather abort
- Curing
Quick answer
A concrete works method statement is the sequence for a pour: wagon access, pump lines, exclusion, washout and curing. The pour window is short — improvisation is how people get burned and drains get polluted.
Primary topic: concrete works method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Washout in drains
Pollution.
No exclusion at hopper
Public.
Rain pour
No abort.
Example
Saturday slab
Built from one job description. You review and adjust every item before issuing it.
Job description
School playground slab, pump from car park, washout skip, no parents on site.
Activities identified
- General site work
- Plant and vehicle movement
- Occupied premises or public areas
- Outdoor or exposed work
Method (5 steps)
- 1.Arrive and sign in. Arrive at Playground, report to the Primary school site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 5.Hand over and sign out. Hand over to the Primary school site contact, report anything outstanding and sign out.
Main risks (3 in total)
Moving vehicles and plant
Residual MediumWho: Operatives, public, site staff
- Pedestrians segregated from vehicle and plant routes
- Plant operated by trained, authorised operators only
- Banksman used for reversing and manoeuvring
- High-visibility clothing worn
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
Adverse weather
Residual LowWho: Operatives
- Forecast checked before work; work at height stopped in high winds
- Breaks, water and shade in hot weather; warm clothing in cold
- Sun protection on exposed work in summer
What to get right on this document
Washout named
Lined skip or bay.
Exclusion
Hopper and lines.
Abort
Rain and delays.
What this document has to cover
If washout is not a numbered step, it will happen in a gully.
A concrete works method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Wagons vs people
- Cement burns
- Burst lines
- Slurry slips
- Pollution
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm mix and access
- Exclusion
- Place and compact
- Finish
- Washout in the bay
- Cure and protect
Occupancy and other people
School and street pours have publics on a timetable. Exclusion must hold at home time.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Wet cement
- Release agents
- Diesel
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer concrete works method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobConcrete pour RAMSCreate a concrete pour rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesRAMS vs method statementHow the risk assessment and method statement fit together, and when clients ask for a combined RAMS. Practical UK guidance for contractors — with links to free tools.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- Pump RAMS separate?
- Include or attach.
- Fibre in the mix?
- Handling differs.
- Night pour?
- Lighting and noise.
- Who signals the wagon?
- Named.