Concrete pour RAMS

Pours go wrong when pump lines, washout and public exclusion are improvised on the day. Write them before the wagon arrives.

Typical scope

  • Wagon access
  • Pump-line exclusion
  • Washout bay
  • PPE for cement
  • Weather abort
  • Curing

Quick answer

A concrete pour RAMS covers placing, compacting and finishing concrete — including pump lines, exclusion, cement burns and plant interface. The pour is a live operation with a short weather and set window.

Primary topic: concrete pour rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Washout in a gully

    Pollution and a failed audit.

  • No exclusion at the hopper

    Kids at the wagon.

  • Pour in heavy rain

    No abort.

Example

Playground slab pour

Built from one job description. You review and adjust every item before issuing it.

Job description

Pour a 200 mm slab at Greenfield Primary, Oldham, Saturday 07:00–14:00. Pump from the car park, exclusion on the playground, washout in a lined skip, no parents on site.

Activities identified

  • General site work
  • Plant and vehicle movement
  • Outdoor or exposed work

Method (4 steps)

  1. 1.Arrive and sign in. Arrive at Greenfield Primary, Oldham, report to the Greenfield Primary School site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  4. 4.Hand over and sign out. Hand over to the Greenfield Primary School site contact, report anything outstanding and sign out.

Main risks (2 in total)

Moving vehicles and plant

Residual Medium

Who: Operatives, public, site staff

  • Pedestrians segregated from vehicle and plant routes
  • Plant operated by trained, authorised operators only
  • Banksman used for reversing and manoeuvring
  • High-visibility clothing worn

Adverse weather

Residual Low

Who: Operatives

  • Forecast checked before work; work at height stopped in high winds
  • Breaks, water and shade in hot weather; warm clothing in cold
  • Sun protection on exposed work in summer

What to get right on this document

Washout is a control

Named bay, not ‘somewhere on site’.

Lines need exclusion

Bursts injure.

Cement is COSHH

Gloves, visors, washing facilities.

What this document has to cover

Pours go wrong when pump lines, washout and public exclusion are improvised on the day. Write them before the wagon arrives.

A concrete pour rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Plant and wagon interface with people
  • Cement burns and dermatitis
  • Burst pump lines
  • Slips on slurry
  • Manual handling of pokers and rails
  • Washout polluting drains

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Confirm mix, access for wagons and washout location
  • Set exclusion around pump, lines and placing area
  • Place to the pour plan, compact, finish
  • Keep operatives out of unsupported edges
  • Wash out only in the agreed bay
  • Cure, protect and open the area when safe

Occupancy and other people

Street pours and school playgrounds need public exclusion that actually holds when parents arrive at 15:00.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Wet cement
  • Release agents
  • Diesel from pump/wagon

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer concrete pour rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Do I need a pump RAMS as well?
Include the pump in this RAMS or attach the specialist’s — do not leave it oral.
What if the wagon is late?
The RAMS can still be valid; the pour plan may need a new window.
Fibre or rebar?
Handling and trip hazards differ — write what is in the slab.
Night pours?
Add lighting, fatigue and neighbourhood noise.