Soil-nail wall RAMS
This is not a retaining wall RAMS. This job covers installing a soil-nail or king-post retaining wall, and the control that keeps people safe is a temporary-works design and an exclusion below the face before drilling. If the RAMS never names the face, the public below and buried services, a principal contractor will send it back.
Typical scope
- A temporary-works design and an exclusion below the face before drilling as a hold point
- The face, the public below and buried services named
- Exclusion that actually holds
- Sequence that cannot skip the critical control
- Handover of residual hazards
- Review before issue — not a stamp
Quick answer
A soil-nail wall rams covers installing a soil-nail or king-post retaining wall on a named UK site. The critical control is a temporary-works design and an exclusion below the face before drilling. Write the face, the public below and buried services into the sequence — a pack that could describe any retaining wall RAMS will not survive a competent review.
Primary topic: soil-nail wall rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
retaining wall RAMS reused
Missing: a temporary-works design and an exclusion below the face before drilling.
Critical control buried
The face, the public below and buried services belongs in the sequence.
Occupancy ignored
The face, the public below and buried services and that someone who did not read the pack will walk the exclusion.
Example
Soil-nail wall on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Installing a soil-nail or king-post retaining wall at Pool plant, Penrith Leisure, Penrith. Midweek shutdown 09:00–16:00. A temporary-works design and an exclusion below the face before drilling; the face, the public below and buried services; the face, the public below and buried services and that someone who did not read the pack will walk the exclusion.
Activities identified
- General site work
- Manual handling
- Power tools
- Dust-generating work
- Occupied premises or public areas
Method (8 steps)
- 1.Arrive and sign in. Arrive at Pool plant, Penrith Leisure, Penrith, report to the Penrith Leisure site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 5.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 8.Hand over and sign out. Hand over to the Penrith Leisure site contact, report anything outstanding and sign out.
Main risks (5 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
Dust (including silica)
Residual MediumWho: Operatives, people nearby
- Use pre-formed holes, or methods that create less dust
- On-tool extraction (M- or H-class) or water suppression when cutting or drilling
- Clean up with an M-class vacuum — no dry sweeping
- Face-fit tested RPE (FFP3 or equivalent) worn
+ 1 more risks in the full RAMS.
What to get right on this document
Critical control first
Put this hold point first: a temporary-works design and an exclusion below the face before drilling.
Name the site facts
The face, the public below and buried services
People who did not read the pack
The named site stays in use around this soil-nail wall job
What this document has to cover
This is not a retaining wall RAMS. This job covers installing a soil-nail or king-post retaining wall, and the control that keeps people safe is a temporary-works design and an exclusion below the face before drilling. If the RAMS never names the face, the public below and buried services, a principal contractor will send it back.
A soil-nail wall rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- People hurt if a temporary-works design and an exclusion below the face before drilling is skipped on this soil-nail wall job
- Soil-nail wall left open so a passer-by reaches the hazard
- Wrong isolation so a sister soil-nail wall stays live
- Manual handling or dropped parts on this soil-nail wall job
- Weather, dust or a substance unique to installing a soil-nail or king-post retaining wall
- The next crew inheriting an open soil-nail wall hazard because handover was a text to nobody
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Hold point: a temporary-works design and an exclusion below the face before drilling
- Brief the dutyholder on the face, the public below and buried services
- Set an exclusion that matches retaining wall RAMS failing on this site
- Do the work to the sequence that keeps a temporary-works design and an exclusion below the face before drilling first
- Test or prove the critical control still holds
- Handover residual soil-nail wall hazards in writing
Occupancy and other people
The named site stays in use around this soil-nail wall job. Write the face, the public below and buried services and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances used while installing a soil-nail or king-post retaining wall
- Cleaning wipes specified for the finish
- Dust or residue from the opened plant
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer soil-nail wall rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsTemporary works propping method statementWrite a temporary works propping method statement for a named UK site. Sequence the critical control first. You review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a retaining wall RAMS?
- No. A soil-nail wall RAMS has to name the face, the public below and buried services. A retaining wall RAMS will not survive a competent review.
- Can we skip a temporary-works design and an exclusion below the face before drilling?
- No. A temporary-works design and an exclusion below the face before drilling is the hold point. Write it before the work step.
- Who writes the face, the public below and buried services?
- The competent person who issues this soil-nail wall rams. A sticky note is not a handover.
- Can AI issue this soil-nail wall rams?
- A tool can draft a soil-nail wall pack. A competent person reviews and issues it for this site.