Secondary glazing RAMS

You are adding a pane inside a live room, not replacing the outer window. A window-replacement RAMS that never mentions the existing egress, trickle vents or how you keep a classroom in use will fail.

Typical scope

  • Egress windows identified
  • Glass handling plan
  • Room protection
  • Ventilation kept as specified
  • Units not stored on escape
  • Occupier brief on opening

Quick answer

A secondary-glazing RAMS covers fitting an internal glazed frame to an existing window on a named elevation. Glass handling, occupied rooms and not blocking a fire-egress window are the usual controls.

Primary topic: secondary glazing rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Window-replacement RAMS reused

    Wrong side of the wall.

  • Secondary pane on a fire-egress sash

    Blocked escape.

  • Units stacked in the stair

    Escape.

Example

Classroom secondary glazing in a holiday

Built from one job description. You review and adjust every item before issuing it.

Job description

Fit secondary glazing in classrooms 2–4 at Millfield Primary, Norwich, Easter holiday. Egress sashes left operable, two-person glass, units in the hall not the stair, caretaker briefed, no sealing of trickle vents.

Activities identified

  • General site work
  • Manual handling

Method (6 steps)

  1. 1.Arrive and sign in. Arrive at Millfield Primary, Norwich, report to the Millfield Primary site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  4. 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  5. 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  6. 6.Hand over and sign out. Hand over to the Millfield Primary site contact, report anything outstanding and sign out.

Main risks (1 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

What to get right on this document

Egress beats acoustic

Do not block it.

Glass is a load

Two people.

Ventilation is specified

Do not seal the room dead.

What this document has to cover

You are adding a pane inside a live room, not replacing the outer window. A window-replacement RAMS that never mentions the existing egress, trickle vents or how you keep a classroom in use will fail.

A secondary glazing rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Glass breaking in a live room
  • Blocking a designated fire-egress window
  • Falls from internal access at high windows
  • Manual handling of sealed units through a building
  • Occupants using the room while silicone is wet
  • Trapping a sash that was the only ventilation

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Confirm which windows are egress or ventilation before a frame is offered
  • Protect the room; set a glass route that does not own the escape
  • Fix frames; do not screw blindly into unknown lintels
  • Glaze with a two-person lift; do not leave units on a stair
  • Keep trickle or specified ventilation; do not seal a room dead
  • Clean, brief the occupier on opening and fire egress

Occupancy and other people

Classrooms and listed offices stay in use. Write the room outage and that a fire-egress window is not a ‘nice extra’ you can block.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Silicone and packers
  • Solvent cleaners
  • Old paint — survey before sanding

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer secondary glazing rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this window replacement?
No — the outer window stays. Different opening and public risks.
Listed building?
Follow the consent; do not screw a frame into a protected finish.
Can I do this in term time?
Only with a room closedown — write it.
Who confirms egress?
The fire strategy or building control — do not guess.