Glazing and curtain walling RAMS

Create a site-specific glazing or curtain walling RAMS online. Describe the job, review suggested risks and method steps, and download a professional PDF.

Typical scope

  • Curtain walling
  • Window replacement
  • Balustrade glass
  • Roof glazing
  • Shopfronts
  • Sealed unit swaps in occupied buildings

Glass injuries and dropped loads are foreseeable. Handling aids and exclusion are not optional extras.

Quick answer

A glazing RAMS covers glass handling and storage, lifting, work at height on elevations, wind stop-rules, and protecting the public below during installation.

Primary topic: curtain walling method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Manual handling of units

    Use vacuum lifters/frames — write them in.

  • Wind on elevations

    Stop criteria for crane/MEWP glass installs.

  • Occupied buildings

    Crash decks/fans and out-of-hours windows.

Example

Hotel window replacement floor-by-floor

Built from one job description. You review and adjust every item before issuing it.

Job description

Replace sealed units on floors 3–5 of the Harbour Hotel using a mast climber and vacuum lifters. Guests in residence; work 09:00–17:00 with exclusion on the terrace below.

Activities identified

  • General site work
  • Manual handling
  • Occupied premises or public areas

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Harbour Hotel, south elevation, report to the Harbour Hotels site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  5. 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Harbour Hotels site contact, report anything outstanding and sign out.

Main risks (2 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

Members of the public and building occupants

Residual Low

Who: Public, customers, staff, residents

  • Work area segregated with barriers and clear signage
  • Work timed for quieter periods where possible, agreed with the site
  • Tools and materials never left unattended in public areas
  • Site contact informed of work areas and any disruption

What to get right on this document

Handling equipment

Declared method for moving units.

Exclusion below

No informal walkways under lifts.

Waste glass

Segregation and sharps controls.

Quick answer

A glazing RAMS covers glass handling and storage, lifting, work at height on elevations, wind stop-rules, and protecting the public below during installation.

What good looks like on a UK site

Glass injuries and dropped loads are foreseeable. Handling aids and exclusion are not optional extras. Name the site, the people at risk, and the sequence that keeps them safe. Generic paragraphs that could apply anywhere are the first thing a principal contractor rejects.

How SafeForJob helps

  • Describe the job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer curtain walling method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by trade · RAMS by trade · Free RAMS generator

Questions

Do I need a crash deck?
Where people could be below, plan protection — client's PC may specify.
Internal glass?
Still cover handling, cuts and access.
Temporary weatherproofing?
Include if openings are left overnight.