Skip to content
SafeForJob

RAMS by job · UK

Loading platform RAMS

This is not a mobile crane RAMS. This job covers installing a loading platform on a live elevation, and the control that keeps people safe is a temporary-works design and a street exclusion before the platform is hung. If the RAMS never names the drop zone, the design load and remaining traffic, a principal contractor will send it back.

Typical scope

  • A temporary-works design and a street exclusion before the platform is hung as a hold point
  • The drop zone, the design load and remaining traffic named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A loading platform rams covers installing a loading platform on a live elevation on a named UK site. The critical control is a temporary-works design and a street exclusion before the platform is hung. Write the drop zone, the design load and remaining traffic into the sequence — a pack that could describe any mobile crane RAMS will not survive a competent review.

Primary topic: loading platform rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • mobile crane RAMS reused

    Missing: a temporary-works design and a street exclusion before the platform is hung.

  • Critical control buried

    The drop zone, the design load and remaining traffic belongs in the sequence.

  • Occupancy ignored

    The drop zone, the design load and remaining traffic and that someone who did not read the pack will walk the exclusion.

Example

Loading platform on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Installing a loading platform on a live elevation at Roof, Salisbury Close, Salisbury. Sunday 06:00–14:00. A temporary-works design and a street exclusion before the platform is hung; the drop zone, the design load and remaining traffic; the drop zone, the design load and remaining traffic and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work
  • Roof work
  • Manual handling

Method (8 steps)

  1. 1.Arrive and sign in. Arrive at Roof, Salisbury Close, Salisbury, report to the Salisbury Close FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up exclusion zone below. Establish an exclusion zone below the work area with barriers and signage before any work at height starts.
  4. 4.Access the roof. Access the roof via the agreed route. Confirm edge protection is in place and identify any fragile areas before moving onto the roof.
  5. 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  6. 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  7. 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  8. 8.Hand over and sign out. Hand over to the Salisbury Close FM site contact, report anything outstanding and sign out.

Main risks (5 in total)

Fall from roof edge

Residual Medium

Who: Operatives

  • Plan work to be done from below or from a MEWP where possible
  • Edge protection (guard rails) or parapet of adequate height in place before work starts
  • Safe access route to the roof agreed with the site; roof hatch secured open
  • Where collective protection isn't possible, use a fall-restraint system with suitable anchors
  • Work stops in high winds, ice or heavy rain

Fall through fragile roof or rooflight

Residual Medium

Who: Operatives

  • Treat all roof sheets and rooflights as fragile unless confirmed otherwise by the site
  • Rooflights covered or protected with suitable mesh or barriers
  • Staging or crawling boards used; no walking directly on sheets
  • Safety netting or fall arrest below where required

Falling objects

Residual Low

Who: People below, other trades, public

  • Exclusion zone set up below the work area with barriers and signage
  • Tools tethered when working at height; materials kept away from edges
  • Banksman or second person controls the area during lifts and removals
  • Hard hats worn in the exclusion zone

Adverse weather

Residual Low

Who: Operatives

  • Forecast checked before work; work at height stopped in high winds
  • Breaks, water and shade in hot weather; warm clothing in cold
  • Sun protection on exposed work in summer

+ 1 more risks in the full RAMS.

What to get right on this document

Critical control first

Put this hold point first: a temporary-works design and a street exclusion before the platform is hung.

Name the site facts

The drop zone, the design load and remaining traffic

People who did not read the pack

The named site stays in use around this loading platform job

What this document has to cover

This is not a mobile crane RAMS. This job covers installing a loading platform on a live elevation, and the control that keeps people safe is a temporary-works design and a street exclusion before the platform is hung. If the RAMS never names the drop zone, the design load and remaining traffic, a principal contractor will send it back.

A loading platform rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if a temporary-works design and a street exclusion before the platform is hung is skipped on this loading platform job
  • Loading platform left open so a passer-by reaches the hazard
  • Wrong isolation so a sister loading platform stays live
  • Manual handling or dropped parts on this loading platform job
  • Weather, dust or a substance unique to installing a loading platform on a live elevation
  • The next crew inheriting an open loading platform hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: a temporary-works design and a street exclusion before the platform is hung
  • Brief the dutyholder on the drop zone, the design load and remaining traffic
  • Set an exclusion that matches mobile crane RAMS failing on this site
  • Do the work to the sequence that keeps a temporary-works design and a street exclusion before the platform is hung first
  • Test or prove the critical control still holds
  • Handover residual loading platform hazards in writing

Occupancy and other people

The named site stays in use around this loading platform job. Write the drop zone, the design load and remaining traffic and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while installing a loading platform on a live elevation
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer loading platform rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a mobile crane RAMS?
No. A loading platform RAMS has to name the drop zone, the design load and remaining traffic. A mobile crane RAMS will not survive a competent review.
Can we skip a temporary-works design and a street exclusion before the platform is hung?
No. A temporary-works design and a street exclusion before the platform is hung is the hold point. Write it before the work step.
Who writes the drop zone, the design load and remaining traffic?
The competent person who issues this loading platform rams. A sticky note is not a handover.
Can AI issue this loading platform rams?
A tool can draft a loading platform pack. A competent person reviews and issues it for this site.