Skip to content
SafeForJob

RAMS by job · UK

Lift-pit clean RAMS

This is not a lift motor room RAMS. This job covers cleaning a lift pit on an occupied shaft, and the control that keeps people safe is lock-off of the lift and a landing watch before anyone is in the pit. If the RAMS never names which lift is out, landing notices and who holds pit keys, a principal contractor will send it back.

Typical scope

  • Lock-off of the lift and a landing watch before anyone is in the pit as a hold point
  • Which lift is out, landing notices and who holds pit keys named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A lift-pit clean rams covers cleaning a lift pit on an occupied shaft on a named UK site. The critical control is lock-off of the lift and a landing watch before anyone is in the pit. Write which lift is out, landing notices and who holds pit keys into the sequence — a pack that could describe any lift motor room RAMS will not survive a competent review.

Primary topic: lift-pit clean rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • lift motor room RAMS reused

    No lock-off of the lift and a landing watch before anyone is in the pit.

  • Critical control buried

    Which lift is out, landing notices and who holds pit keys belongs in the sequence.

  • Occupancy ignored

    Which lift is out, landing notices and who holds pit keys and that someone who did not read the pack will walk the exclusion.

Example

Lift-pit clean on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Cleaning a lift pit on an occupied shaft at Deck, Bedford Wharf, Bedford. Holiday week, staff return Friday. Lock-off of the lift and a landing watch before anyone is in the pit; which lift is out, landing notices and who holds pit keys; which lift is out, landing notices and who holds pit keys and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work
  • Electrical isolation
  • Occupied premises or public areas

Method (8 steps)

  1. 1.Arrive and sign in. Arrive at Deck, Bedford Wharf, Bedford, report to the Bedford Wharf site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  5. 5.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  6. 6.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  7. 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  8. 8.Hand over and sign out. Hand over to the Bedford Wharf site contact, report anything outstanding and sign out.

Main risks (2 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

Members of the public and building occupants

Residual Low

Who: Public, customers, staff, residents

  • Work area segregated with barriers and clear signage
  • Work timed for quieter periods where possible, agreed with the site
  • Tools and materials never left unattended in public areas
  • Site contact informed of work areas and any disruption

What to get right on this document

Critical control first

Put this hold point first: lock-off of the lift and a landing watch before anyone is in the pit.

Name the site facts

Which lift is out, landing notices and who holds pit keys

People who did not read the pack

The named site stays in use around this lift-pit clean job

What this document has to cover

This is not a lift motor room RAMS. This job covers cleaning a lift pit on an occupied shaft, and the control that keeps people safe is lock-off of the lift and a landing watch before anyone is in the pit. If the RAMS never names which lift is out, landing notices and who holds pit keys, a principal contractor will send it back.

A lift-pit clean rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if lock-off of the lift and a landing watch before anyone is in the pit is skipped on this lift-pit clean job
  • Lift-pit clean left open so a passer-by reaches the hazard
  • Wrong isolation so a sister lift-pit clean stays live
  • Manual handling or dropped parts on this lift-pit clean job
  • Weather, dust or a substance unique to cleaning a lift pit on an occupied shaft
  • The next crew inheriting an open lift-pit clean hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: lock-off of the lift and a landing watch before anyone is in the pit
  • Brief the dutyholder on which lift is out, landing notices and who holds pit keys
  • Set an exclusion that matches lift motor room RAMS failing on this site
  • Do the work to the sequence that keeps lock-off of the lift and a landing watch before anyone is in the pit first
  • Test or prove the critical control still holds
  • Handover residual lift-pit clean hazards in writing

Occupancy and other people

The named site stays in use around this lift-pit clean job. Write which lift is out, landing notices and who holds pit keys and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while cleaning a lift pit on an occupied shaft
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer lift-pit clean rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a lift motor room RAMS?
No. A lift-pit clean RAMS has to name which lift is out, landing notices and who holds pit keys. A lift motor room RAMS will not survive a competent review.
Can we skip lock-off of the lift and a landing watch before anyone is in the pit?
No. Lock-off of the lift and a landing watch before anyone is in the pit is the hold point. Write it before the work step.
Who writes which lift is out, landing notices and who holds pit keys?
The competent person who issues this lift-pit clean rams. A sticky note is not a handover.
Can AI issue this lift-pit clean rams?
A tool can draft a lift-pit clean pack. A competent person reviews and issues it for this site.