Lift maintenance RAMS

A shaft is not a plant cupboard. Landing controls, pit access and electrical isolation have to be explicit.

Typical scope

  • Out-of-service procedure
  • Lock-off
  • Car-top / pit method
  • Communication
  • Landing security
  • Return-to-service test

Quick answer

A lift maintenance RAMS covers routine and breakdown work in shafts, pits and motor rooms. Stored energy, falls, crushing and lone work are the harms that generic M&E RAMS skip.

Primary topic: lift maintenance rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • M&E RAMS reused

    No shaft content.

  • Landing gated with tape

    Public still at risk.

  • Lone engineer, no check-in

    No communication plan.

Example

Quarterly service in an office lift

Built from one job description. You review and adjust every item before issuing it.

Job description

Service Lift 2 at Merchants House, Glasgow. Take out of service, lock off, car-top work with communication to a second person in the lobby, return to service before 08:00.

Activities identified

  • General site work
  • Electrical isolation

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Merchants House, Glasgow, report to the Merchants House FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  4. 4.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  5. 5.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Merchants House FM site contact, report anything outstanding and sign out.

Main risks (1 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

What to get right on this document

The car must not move

Lock-off and landing procedure.

Pit is restricted

Access method named.

Public landings

Physical barrier, not tape.

What this document has to cover

A shaft is not a plant cupboard. Landing controls, pit access and electrical isolation have to be explicit.

A lift maintenance rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Fall down the shaft
  • Crushing from unexpected car movement
  • Electric shock in motor rooms
  • Lone working / no communication
  • Pit hygiene and restricted space
  • Public at landings

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Take the car out of public service; station a person at the landing if needed
  • Isolate and lock off per the lift’s procedure
  • Access pit or car top only with the designed controls
  • Complete the task, restore guards
  • Test movement from a position of safety
  • Return to service and brief the client

Occupancy and other people

Buildings stay open. A landing left open with a cone is not a control. Barriers and a person may be required.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Oils and greases
  • Cleaning solvents
  • Possible hydraulic fluid

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer lift maintenance rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is the pit a confined space?
Assess it — some are. Do not assume.
Can one engineer do it?
Only with a communication/lone-work plan that actually works in a shaft.
Modern MRL lifts?
Still isolation and crushing risks — use the manufacturer procedure.
Passenger trapped during arrival?
Your RAMS should not start until the lift is out of service.