Kitchen UV filter RAMS

This is not a kitchen extract clean RAMS. This job covers fitting UV or polarised filters on a live kitchen extract, and the control that keeps people safe is chef shutdown and isolation of the extract before the filter bank is opened. If the RAMS never names grease, UV exposure and service time, a principal contractor will send it back.

Typical scope

  • Chef shutdown and isolation of the extract before the filter bank is opened as a hold point
  • Grease, UV exposure and service time named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A kitchen uv filter rams covers fitting UV or polarised filters on a live kitchen extract on a named UK site. The critical control is chef shutdown and isolation of the extract before the filter bank is opened. Write grease, UV exposure and service time into the sequence — a pack that could describe any kitchen extract clean RAMS will not survive a competent review.

Primary topic: kitchen uv filter rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • kitchen extract clean RAMS reused

    No chef shutdown and isolation of the extract before the filter bank is opened.

  • Critical control buried

    Grease, UV exposure and service time belongs in the sequence.

  • Occupancy ignored

    Grease, UV exposure and service time and that someone who did not read the pack will walk the exclusion.

Example

Kitchen UV filter on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Fitting UV or polarised filters on a live kitchen extract at Pool plant, Penrith Leisure, Penrith. Midweek shutdown 09:00–16:00. Chef shutdown and isolation of the extract before the filter bank is opened; grease, UV exposure and service time; grease, UV exposure and service time and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work

Method (4 steps)

  1. 1.Arrive and sign in. Arrive at Pool plant, Penrith Leisure, Penrith, report to the Penrith Leisure site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  4. 4.Hand over and sign out. Hand over to the Penrith Leisure site contact, report anything outstanding and sign out.

Main risks (0 in total)

What to get right on this document

Critical control first

Put this hold point first: chef shutdown and isolation of the extract before the filter bank is opened.

Name the site facts

Grease, UV exposure and service time

People who did not read the pack

The named site stays in use around this kitchen uv filter job

What this document has to cover

This is not a kitchen extract clean RAMS. This job covers fitting UV or polarised filters on a live kitchen extract, and the control that keeps people safe is chef shutdown and isolation of the extract before the filter bank is opened. If the RAMS never names grease, UV exposure and service time, a principal contractor will send it back.

A kitchen uv filter rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if chef shutdown and isolation of the extract before the filter bank is opened is skipped on this kitchen uv filter job
  • Kitchen UV filter left open so a passer-by reaches the hazard
  • Wrong isolation so a sister kitchen uv filter stays live
  • Manual handling or dropped parts on this kitchen uv filter job
  • Weather, dust or a substance unique to fitting UV or polarised filters on a live kitchen extract
  • The next crew inheriting an open kitchen uv filter hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: chef shutdown and isolation of the extract before the filter bank is opened
  • Brief the dutyholder on grease, UV exposure and service time
  • Set an exclusion that matches kitchen extract clean RAMS failing on this site
  • Do the work to the sequence that keeps chef shutdown and isolation of the extract before the filter bank is opened first
  • Test or prove the critical control still holds
  • Handover residual kitchen uv filter hazards in writing

Occupancy and other people

The named site stays in use around this kitchen uv filter job. Write grease, UV exposure and service time and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while fitting UV or polarised filters on a live kitchen extract
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer kitchen uv filter rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a kitchen extract clean RAMS?
No. A kitchen uv filter RAMS has to name grease, UV exposure and service time. A kitchen extract clean RAMS will not survive a competent review.
Can we skip chef shutdown and isolation of the extract before the filter bank is opened?
No. Chef shutdown and isolation of the extract before the filter bank is opened is the hold point. Write it before the work step.
Who writes grease, UV exposure and service time?
The competent person who issues this kitchen uv filter rams. A sticky note is not a handover.
Can AI issue this kitchen uv filter rams?
A tool can draft a kitchen uv filter pack. A competent person reviews and issues it for this site.