RAMS by job · UK
Kitchen servery RAMS
A servery is a heavy, powered, wet counter in a public room, not a kitchen range. A commercial-kitchen RAMS that never mentions diners, sneeze screens or how you keep an escape through a dining hall will fail the manager.
Typical scope
- Dining room closed or routed
- Handling plan
- Water test before service
- Guards before heat-on
- Crates off the escape
- Floor dry at opening
Quick answer
A kitchen-servery RAMS covers installing a hot or cold servery counter in a named canteen or restaurant. The lift, electrical and water connections, and a dining room that may still be serving are the usual harms.
Primary topic: kitchen servery rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Range RAMS reused
No diners, no sneeze screen.
Heat-on at 12:00 with a queue
Burns.
Crate in the fire exit
Escape.
Example
Hot servery in a school dining hall
Built from one job description. You review and adjust every item before issuing it.
Job description
Install a hot servery at Millfield Primary, Norwich, inset day. Hall closed, three-phase isolated, four-person lift, water-test, sneeze screens on before heat, crates out, no pupil queue until the floor is dry and the cook signs.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Dining hall, Millfield Primary, Norwich, report to the Millfield Primary site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Millfield Primary site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Service waits
Closed sitting.
Guards before heat
Children and trays.
The dining room is public
Route or close it.
What this document has to cover
A servery is a heavy, powered, wet counter in a public room, not a kitchen range. A commercial-kitchen RAMS that never mentions diners, sneeze screens or how you keep an escape through a dining hall will fail the manager.
A kitchen servery rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Dropped counter or hot-cupboard in a dining room
- Electric shock on three-phase servery kit
- Water leaks onto a public floor
- Public walking the landing zone at lunch
- Hot surfaces commissioned while children are queuing
- Escape blocked by crates and a half-sited counter
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Agree the dining room is closed or a marshalled route exists before the crate arrives
- Isolate power and water; handle with a plan
- Site, level, connect; water-test before service
- Fit sneeze screens and guards before any heat-on
- Commission temperatures with the room empty
- Remove crates; do not open the line until the floor is dry
Occupancy and other people
Schools and hospitals serve on a clock. Write the closed sitting and that a hot well is not demonstrated to a queue.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Cleaning chemicals on a new well
- Jointing compounds
- Packaging
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer kitchen servery rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeKitchen fitter RAMSRAMS for kitchen fitting: services isolation, stone silica, stairs and residents.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsKitchen fitting method statementSequence for kitchen fitting: services, stone cutting, handling and occupier.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a commercial kitchen install?
- The cook-line is a different grease and gas package. This is the public servery.
- Gas well?
- Add Gas Safe tightness if you connect gas.
- Can we do it at lunch?
- Only with a closed hall — write it.
- Who owns food hygiene?
- The cook — your handover is power, water and guards.