Kitchen hood interlock RAMS

This is not a kitchen first-fix power RAMS. This job covers wiring or proving a gas or induction interlock to kitchen extract, and the control that keeps people safe is a chef-agreed shutdown and prove-dead before the interlock is opened. If the RAMS never names whether gas stays available, the interlock logic and service time, a principal contractor will send it back.

Typical scope

  • A chef-agreed shutdown and prove-dead before the interlock is opened as a hold point
  • Whether gas stays available, the interlock logic and service time named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A kitchen hood interlock rams covers wiring or proving a gas or induction interlock to kitchen extract on a named UK site. The critical control is a chef-agreed shutdown and prove-dead before the interlock is opened. Write whether gas stays available, the interlock logic and service time into the sequence — a pack that could describe any kitchen first-fix power RAMS will not survive a competent review.

Primary topic: kitchen hood interlock rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • kitchen first-fix power RAMS reused

    Missing: a chef-agreed shutdown and prove-dead before the interlock is opened.

  • Critical control buried

    Whether gas stays available, the interlock logic and service time belongs in the sequence.

  • Occupancy ignored

    The closed service and that a junior will light a burner anyway.

Example

Kitchen hood interlock on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Wiring or proving a gas or induction interlock to kitchen extract at Main kitchen, Harbour Kitchen, Falmouth. Monday 00:00–06:00, service 07:00. A chef-agreed shutdown and prove-dead before the interlock is opened; whether gas stays available, the interlock logic and service time; the closed service and that a junior will light a burner anyway.

Activities identified

  • General site work
  • Electrical isolation

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Main kitchen, Harbour Kitchen, Falmouth, report to the Harbour Kitchen Ltd site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  4. 4.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  5. 5.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Harbour Kitchen Ltd site contact, report anything outstanding and sign out.

Main risks (1 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

What to get right on this document

Critical control first

Put this hold point first: a chef-agreed shutdown and prove-dead before the interlock is opened.

Name the site facts

Whether gas stays available, the interlock logic and service time

People who did not read the pack

Kitchens plate around you

What this document has to cover

This is not a kitchen first-fix power RAMS. This job covers wiring or proving a gas or induction interlock to kitchen extract, and the control that keeps people safe is a chef-agreed shutdown and prove-dead before the interlock is opened. If the RAMS never names whether gas stays available, the interlock logic and service time, a principal contractor will send it back.

A kitchen hood interlock rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if a chef-agreed shutdown and prove-dead before the interlock is opened is skipped on this kitchen hood interlock job
  • Gas still on with extract dead
  • Shock on a panel that also feeds the servery
  • Service continuing under a defeated interlock
  • Grease fire risk if the link is left defeated
  • The next crew inheriting an open kitchen hood interlock hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: a chef-agreed shutdown and prove-dead before the interlock is opened
  • Chef agrees the closed kitchen
  • Isolate extract and the interlock supply
  • Wire to the design — no defeated link
  • Commission with the chef present
  • Service only after a pass

Occupancy and other people

Kitchens plate around you. Write the closed service and that a junior will light a burner anyway as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Grease
  • Cleaning wipes
  • Joint compound

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer kitchen hood interlock rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a kitchen first-fix power RAMS?
No. A kitchen hood interlock RAMS has to name whether gas stays available, the interlock logic and service time. A kitchen first-fix power RAMS will not survive a competent review.
Can we skip a chef-agreed shutdown and prove-dead before the interlock is opened?
No. A chef-agreed shutdown and prove-dead before the interlock is opened is the hold point. Write it before the work step.
Who writes whether gas stays available, the interlock logic and service time?
The competent person who issues this kitchen hood interlock rams. A sticky note is not a handover.
Can AI issue this kitchen hood interlock rams?
A tool can draft a kitchen hood interlock pack. A competent person reviews and issues it for this site.