King-post wall RAMS
This is not a soil nail wall RAMS. This job covers installing a king-post retaining wall on a named site, and the control that keeps people safe is a temporary-works design and a lift plan before the first post. If the RAMS never names the face, plant and who is below, a principal contractor will send it back.
Typical scope
- A temporary-works design and a lift plan before the first post as a hold point
- The face, plant and who is below named
- Exclusion that actually holds
- Sequence that cannot skip the critical control
- Handover of residual hazards
- Review before issue — not a stamp
Quick answer
A king-post wall rams covers installing a king-post retaining wall on a named site on a named UK site. The critical control is a temporary-works design and a lift plan before the first post. Write the face, plant and who is below into the sequence — a pack that could describe any soil nail wall RAMS will not survive a competent review.
Primary topic: king-post wall rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
soil nail wall RAMS reused
Missing: a temporary-works design and a lift plan before the first post.
Critical control buried
The face, plant and who is below belongs in the sequence.
Occupancy ignored
The face, plant and who is below and that someone who did not read the pack will walk the exclusion.
Example
King-post wall on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Installing a king-post retaining wall on a named site at Block C, Ripon Close, Ripon. Holiday week, staff return Friday. A temporary-works design and a lift plan before the first post; the face, plant and who is below; the face, plant and who is below and that someone who did not read the pack will walk the exclusion.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Block C, Ripon Close, Ripon, report to the Ripon Close Housing site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Ripon Close Housing site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Critical control first
Put this hold point first: a temporary-works design and a lift plan before the first post.
Name the site facts
The face, plant and who is below
People who did not read the pack
The named site stays in use around this king-post wall job
What this document has to cover
This is not a soil nail wall RAMS. This job covers installing a king-post retaining wall on a named site, and the control that keeps people safe is a temporary-works design and a lift plan before the first post. If the RAMS never names the face, plant and who is below, a principal contractor will send it back.
A king-post wall rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- People hurt if a temporary-works design and a lift plan before the first post is skipped on this king-post wall job
- King-post wall left open so a passer-by reaches the hazard
- Wrong isolation so a sister king-post wall stays live
- Manual handling or dropped parts on this king-post wall job
- Weather, dust or a substance unique to installing a king-post retaining wall on a named site
- The next crew inheriting an open king-post wall hazard because handover was a text to nobody
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Hold point: a temporary-works design and a lift plan before the first post
- Brief the dutyholder on the face, plant and who is below
- Set an exclusion that matches soil nail wall RAMS failing on this site
- Do the work to the sequence that keeps a temporary-works design and a lift plan before the first post first
- Test or prove the critical control still holds
- Handover residual king-post wall hazards in writing
Occupancy and other people
The named site stays in use around this king-post wall job. Write the face, plant and who is below and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances used while installing a king-post retaining wall on a named site
- Cleaning wipes specified for the finish
- Dust or residue from the opened plant
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer king-post wall rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsTemporary works propping method statementWrite a temporary works propping method statement for a named UK site. Sequence the critical control first. You review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a soil nail wall RAMS?
- No. A king-post wall RAMS has to name the face, plant and who is below. A soil nail wall RAMS will not survive a competent review.
- Can we skip a temporary-works design and a lift plan before the first post?
- No. A temporary-works design and a lift plan before the first post is the hold point. Write it before the work step.
- Who writes the face, plant and who is below?
- The competent person who issues this king-post wall rams. A sticky note is not a handover.
- Can AI issue this king-post wall rams?
- A tool can draft a king-post wall pack. A competent person reviews and issues it for this site.