Skip to content
SafeForJob

RAMS by job · UK

Hydraulic power pack RAMS

This is not a compressed air RAMS. This job covers installing or servicing a hydraulic power pack, and the control that keeps people safe is isolation of pressure and a written residual-energy method before hoses are cracked. If the RAMS never names stored pressure, oil injection and who is in the pit, a principal contractor will send it back.

Typical scope

  • Isolation of pressure and a written residual-energy method before hoses are cracked as a hold point
  • Stored pressure, oil injection and who is in the pit named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A hydraulic power pack rams covers installing or servicing a hydraulic power pack on a named UK site. The critical control is isolation of pressure and a written residual-energy method before hoses are cracked. Write stored pressure, oil injection and who is in the pit into the sequence — a pack that could describe any compressed air RAMS will not survive a competent review.

Primary topic: hydraulic power pack rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • compressed air RAMS reused

    No isolation of pressure and a written residual-energy method before hoses are cracked.

  • Critical control buried

    Stored pressure, oil injection and who is in the pit belongs in the sequence.

  • Occupancy ignored

    Stored pressure, oil injection and who is in the pit and that someone who did not read the pack will walk the exclusion.

Example

Hydraulic power pack on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Installing or servicing a hydraulic power pack at Quay store, Elgin Dock, Elgin. Night 21:00–05:30. Isolation of pressure and a written residual-energy method before hoses are cracked; stored pressure, oil injection and who is in the pit; stored pressure, oil injection and who is in the pit and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work
  • Manual handling
  • Occupied premises or public areas
  • Lone working

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Quay store, Elgin Dock, Elgin, report to the Elgin Dock Trust site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  5. 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Elgin Dock Trust site contact, report anything outstanding and sign out.

Main risks (3 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

Members of the public and building occupants

Residual Low

Who: Public, customers, staff, residents

  • Work area segregated with barriers and clear signage
  • Work timed for quieter periods where possible, agreed with the site
  • Tools and materials never left unattended in public areas
  • Site contact informed of work areas and any disruption

Lone working

Residual Low

Who: Lone operatives

  • Higher-risk tasks (work at height, live work, confined spaces) not carried out alone
  • Check-in procedure agreed with the office at set times
  • Mobile phone charged and signal checked on arrival

What to get right on this document

Critical control first

Put this hold point first: isolation of pressure and a written residual-energy method before hoses are cracked.

Name the site facts

Stored pressure, oil injection and who is in the pit

People who did not read the pack

The named site stays in use around this hydraulic power pack job

What this document has to cover

This is not a compressed air RAMS. This job covers installing or servicing a hydraulic power pack, and the control that keeps people safe is isolation of pressure and a written residual-energy method before hoses are cracked. If the RAMS never names stored pressure, oil injection and who is in the pit, a principal contractor will send it back.

A hydraulic power pack rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if isolation of pressure and a written residual-energy method before hoses are cracked is skipped on this hydraulic power pack job
  • Hydraulic power pack left open so a passer-by reaches the hazard
  • Wrong isolation so a sister hydraulic power pack stays live
  • Manual handling or dropped parts on this hydraulic power pack job
  • Weather, dust or a substance unique to installing or servicing a hydraulic power pack
  • The next crew inheriting an open hydraulic power pack hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: isolation of pressure and a written residual-energy method before hoses are cracked
  • Brief the dutyholder on stored pressure, oil injection and who is in the pit
  • Set an exclusion that matches compressed air RAMS failing on this site
  • Do the work to the sequence that keeps isolation of pressure and a written residual-energy method before hoses are cracked first
  • Test or prove the critical control still holds
  • Handover residual hydraulic power pack hazards in writing

Occupancy and other people

The named site stays in use around this hydraulic power pack job. Write stored pressure, oil injection and who is in the pit and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while installing or servicing a hydraulic power pack
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer hydraulic power pack rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a compressed air RAMS?
No. A hydraulic power pack RAMS has to name stored pressure, oil injection and who is in the pit. A compressed air RAMS will not survive a competent review.
Can we skip isolation of pressure and a written residual-energy method before hoses are cracked?
No. Isolation of pressure and a written residual-energy method before hoses are cracked is the hold point. Write it before the work step.
Who writes stored pressure, oil injection and who is in the pit?
The competent person who issues this hydraulic power pack rams. A sticky note is not a handover.
Can AI issue this hydraulic power pack rams?
A tool can draft a hydraulic power pack pack. A competent person reviews and issues it for this site.