High-level cleaning RAMS

This is access plus unknown dirt, not a mop. A MEWP RAMS that never mentions pigeon guano, falling dust onto food or how you close an aisle will fail the hygiene manager.

Typical scope

  • Dirt characterised
  • Hard exclusion below
  • Named access machine
  • No compressed-air blow-down
  • Waste bagged
  • Aisle inspected before reopen

Quick answer

A high-level cleaning RAMS covers dusting or washing structure, services and luminaires from a MEWP or podium in a named hall. Falls, falling debris onto operations, and COSHH of the dirt you disturb are the usual harms.

Primary topic: high level cleaning rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • MEWP RAMS reused

    No dirt COSHH, no product below.

  • Air-line used as a duster

    Cloud over food.

  • Guano treated as dust

    Biohazard skipped.

Example

High-level clean over a picking hall

Built from one job description. You review and adjust every item before issuing it.

Job description

Clean portal haunches in hall 2 at Ridings Fulfilment, Wakefield. Night shift, aisle G closed, scissor, guano survey first (none found), no air-line, waste bagged, pick path diverted, hygiene walk before 05:00.

Activities identified

  • General site work
  • Lone working

Method (4 steps)

  1. 1.Arrive and sign in. Arrive at Hall 2, Ridings Fulfilment, Wakefield, report to the Ridings Fulfilment site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  4. 4.Hand over and sign out. Hand over to the Ridings Fulfilment site contact, report anything outstanding and sign out.

Main risks (1 in total)

Lone working

Residual Low

Who: Lone operatives

  • Higher-risk tasks (work at height, live work, confined spaces) not carried out alone
  • Check-in procedure agreed with the office at set times
  • Mobile phone charged and signal checked on arrival

What to get right on this document

Know the dirt

Survey if it might be guano or process dust.

Below is closed

Product and people.

Do not blow it

Extract or bag.

What this document has to cover

This is access plus unknown dirt, not a mop. A MEWP RAMS that never mentions pigeon guano, falling dust onto food or how you close an aisle will fail the hygiene manager.

A high level cleaning rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Fall from the platform or through a fragile roof light while reaching
  • Debris, dust or droppings onto people and product below
  • Inhalation of guano, silica or unknown deposits
  • MEWP striking racking or a live busbar
  • Chemical splash from a cleaner used overhead
  • Operations walking back into the exclusion

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Characterise the dirt — survey if guano or unknown industrial dust
  • Set a hard exclusion and product protection below
  • Access from the named machine; do not over-reach
  • Clean with the specified method and COSHH; bag waste
  • Do not blow dust onto a live line with compressed air
  • Inspect the area below before you hand it back

Occupancy and other people

Warehouses and naves stay in use. Write the closed aisle and that agency pickers will ignore a polite cone.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Guano or industrial dust (characterise)
  • Cleaning chemicals named
  • Old lamp debris if luminaires are wiped

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer high level cleaning rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this rope access?
Only if you are on ropes — then use that RAMS. This is platform cleaning.
Food factory?
Add hygiene zoning and no-drop onto open product.
Do I need a COSHH for dust?
Yes if you disturb it — SDS of a cleaner is not enough.
Fragile roof lights?
Do not use them as a platform; write the exclusion.