Cradle window cleaning RAMS

This is a lifting appliance on a facade, not a ladder and a bucket. A rope-access RAMS that never mentions the BMU checks, overload or how you stop drips onto a hospital entrance will fail.

Typical scope

  • BMU pre-use and SWL
  • Rescue plan for this elevation
  • Ground exclusion and spotter
  • Wind abort
  • Tool lanyards
  • No drip on doors

Quick answer

A cradle window-cleaning RAMS covers using a building-maintenance unit or temporary cradle on a named elevation. The BMU, exclusion below, rescue and chemicals over the public are the critical controls.

Primary topic: cradle window cleaning rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Rope RAMS reused

    Wrong machine.

  • Rescue ‘call the fire brigade’

    Not a plan for this cradle.

  • Chemicals dripping on the revolving door

    Public.

Example

BMU clean on a hospital elevation

Built from one job description. You review and adjust every item before issuing it.

Job description

Clean the west elevation from the BMU at Royal Infirmary, Coventry. Pre-use, SWL, wind abort 20 mph, exclusion at the west entrance with a marshal, no drip on the canopy, rescue plan briefed, Tuesday 08:00–12:00.

Activities identified

  • General site work

Method (4 steps)

  1. 1.Arrive and sign in. Arrive at West elevation, Royal Infirmary, Coventry, report to the Trust Estates site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  4. 4.Hand over and sign out. Hand over to the Trust Estates site contact, report anything outstanding and sign out.

Main risks (0 in total)

What to get right on this document

The BMU is the method

Inspect, SWL, abort.

Rescue is written for this building

Not a poster.

Doors are occupancy

Marshal them.

What this document has to cover

This is a lifting appliance on a facade, not a ladder and a bucket. A rope-access RAMS that never mentions the BMU checks, overload or how you stop drips onto a hospital entrance will fail.

A cradle window cleaning rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Fall from a cradle or through a failed suspension
  • Dropped tools or water onto the public
  • BMU overrun, overload or collision with the facade
  • Unable to rescue a stranded operator
  • Chemical drip into eyes at ground
  • Weather — wind abort ignored

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Pre-use inspect the BMU or cradle; confirm SWL, weather limit and a written rescue
  • Set a hard exclusion at ground with a spotter
  • Lanyard tools; control water and chemicals so they do not drip on doors
  • Clean the named elevation; stop for wind or a public breach
  • Recover, isolate the BMU, stand down the exclusion
  • Do not improvise a descent on a single rope from the cradle

Occupancy and other people

Entrances stay busy. Write the door marshal and that a receptionist will send visitors through your drop zone unless you stop them.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Window-cleaning chemicals (name the actual)
  • Bird droppings if present
  • Hydraulic oil on the BMU

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer cradle window cleaning rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this rope access?
No — this is a BMU/cradle. Use the rope RAMS only if that is the access.
Who inspects the BMU?
A competent person on a regime — your pre-use does not replace it.
Can I use any cleaner?
Name it and keep it off the public — SDS ≠ COSHH.
Patients at windows?
Brief wards; do not surprise a bay with a face at the glass.