Skip to content
SafeForJob

RAMS by job · UK

Compactor service RAMS

This is not a dock leveller RAMS. This job covers servicing a waste compactor on a live yard, and the control that keeps people safe is lock-off of the ram and a vehicle exclusion before anyone enters the chamber. If the RAMS never names unexpected motion, HGVs and who holds the key, a principal contractor will send it back.

Typical scope

  • Lock-off of the ram and a vehicle exclusion before anyone enters the chamber as a hold point
  • Unexpected motion, HGVs and who holds the key named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A compactor service rams covers servicing a waste compactor on a live yard on a named UK site. The critical control is lock-off of the ram and a vehicle exclusion before anyone enters the chamber. Write unexpected motion, HGVs and who holds the key into the sequence — a pack that could describe any dock leveller RAMS will not survive a competent review.

Primary topic: compactor service rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • dock leveller RAMS reused

    No lock-off of the ram and a vehicle exclusion before anyone enters the chamber.

  • Critical control buried

    Unexpected motion, HGVs and who holds the key belongs in the sequence.

  • Occupancy ignored

    Unexpected motion, HGVs and who holds the key and that someone who did not read the pack will walk the exclusion.

Example

Compactor service on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Servicing a waste compactor on a live yard at Block B, Ilkley Moor School, Ilkley. Night 21:00–05:30. Lock-off of the ram and a vehicle exclusion before anyone enters the chamber; unexpected motion, HGVs and who holds the key; unexpected motion, HGVs and who holds the key and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work
  • Electrical isolation
  • Confined space
  • Occupied premises or public areas
  • Lone working
  • Outdoor or exposed work

Method (9 steps)

  1. 1.Arrive and sign in. Arrive at Block B, Ilkley Moor School, Ilkley, report to the Ilkley Moor School site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  5. 5.Confined space permit and gas test. Obtain the permit to work, test the atmosphere and confirm rescue arrangements before anyone enters.
  6. 6.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  7. 7.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  8. 8.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  9. 9.Hand over and sign out. Hand over to the Ilkley Moor School site contact, report anything outstanding and sign out.

Main risks (5 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

Confined space

Residual Medium

Who: Operatives, rescuers

  • Avoid entry — do the work from outside where possible
  • Permit to work and confined space trained operatives
  • Atmosphere tested before and during entry with a calibrated gas monitor
  • Emergency rescue arrangements in place before entry

Members of the public and building occupants

Residual Low

Who: Public, customers, staff, residents

  • Work area segregated with barriers and clear signage
  • Work timed for quieter periods where possible, agreed with the site
  • Tools and materials never left unattended in public areas
  • Site contact informed of work areas and any disruption

Lone working

Residual Low

Who: Lone operatives

  • Higher-risk tasks (work at height, live work, confined spaces) not carried out alone
  • Check-in procedure agreed with the office at set times
  • Mobile phone charged and signal checked on arrival

+ 1 more risks in the full RAMS.

What to get right on this document

Critical control first

Put this hold point first: lock-off of the ram and a vehicle exclusion before anyone enters the chamber.

Name the site facts

Unexpected motion, HGVs and who holds the key

People who did not read the pack

The named site stays in use around this compactor service job

What this document has to cover

This is not a dock leveller RAMS. This job covers servicing a waste compactor on a live yard, and the control that keeps people safe is lock-off of the ram and a vehicle exclusion before anyone enters the chamber. If the RAMS never names unexpected motion, HGVs and who holds the key, a principal contractor will send it back.

A compactor service rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if lock-off of the ram and a vehicle exclusion before anyone enters the chamber is skipped on this compactor service job
  • Compactor service left open so a passer-by reaches the hazard
  • Wrong isolation so a sister compactor service stays live
  • Manual handling or dropped parts on this compactor service job
  • Weather, dust or a substance unique to servicing a waste compactor on a live yard
  • The next crew inheriting an open compactor service hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: lock-off of the ram and a vehicle exclusion before anyone enters the chamber
  • Brief the dutyholder on unexpected motion, HGVs and who holds the key
  • Set an exclusion that matches dock leveller RAMS failing on this site
  • Do the work to the sequence that keeps lock-off of the ram and a vehicle exclusion before anyone enters the chamber first
  • Test or prove the critical control still holds
  • Handover residual compactor service hazards in writing

Occupancy and other people

The named site stays in use around this compactor service job. Write unexpected motion, HGVs and who holds the key and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while servicing a waste compactor on a live yard
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer compactor service rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a dock leveller RAMS?
No. A compactor service RAMS has to name unexpected motion, HGVs and who holds the key. A dock leveller RAMS will not survive a competent review.
Can we skip lock-off of the ram and a vehicle exclusion before anyone enters the chamber?
No. Lock-off of the ram and a vehicle exclusion before anyone enters the chamber is the hold point. Write it before the work step.
Who writes unexpected motion, HGVs and who holds the key?
The competent person who issues this compactor service rams. A sticky note is not a handover.
Can AI issue this compactor service rams?
A tool can draft a compactor service pack. A competent person reviews and issues it for this site.