Bird netting RAMS

This is access plus a biohazard plus a live animal issue, not a bit of facilities kit. A high-level cleaning RAMS that never mentions nest season, exclusion below or how you stop net becoming a trap will fail.

Typical scope

  • Nest check first
  • Guano COSHH
  • Exclusion below
  • Specified mesh and tension
  • No dry sweep
  • Handover inspection regime

Quick answer

A bird-netting RAMS covers installing net, spikes or wires on a named ledge or lightwell. Height, guano COSHH, wildlife law and the public below are the critical harms.

Primary topic: bird netting rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Cleaning RAMS reused

    No wildlife, no tension.

  • Net left slack as a hammock

    Trapped birds.

  • Guano blown off with an air-line

    Cloud over a door.

Example

Lightwell net over an office door

Built from one job description. You review and adjust every item before issuing it.

Job description

Net the rear lightwell at Civic House, York. Nest check (none active), guano bagged, podium and lanyards, specified mesh, well closed, smokers moved to the side gate, no dry sweep onto the basement door.

Activities identified

  • General site work
  • Ladders or stepladders

Method (5 steps)

  1. 1.Arrive and sign in. Arrive at Rear lightwell, Civic House, York, report to the Civic House FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up access equipment. Inspect and set up the podium or stepladder on firm, level ground in the work area.
  4. 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  5. 5.Hand over and sign out. Hand over to the Civic House FM site contact, report anything outstanding and sign out.

Main risks (1 in total)

Fall from ladders or stepladders

Residual Medium

Who: Operatives

  • Use a podium or mobile tower instead of a ladder where the task allows
  • Ladders only for short-duration (under 30 minutes), light work with three points of contact
  • Ladder inspected before use; industrial-grade (EN 131 professional) only
  • Ladder set on firm, level ground and footed or secured
  • No overreaching — move the ladder instead

What to get right on this document

Nests stop the job

Check, then work.

Guano is COSHH

Bag, do not blow.

Tension is welfare

No pockets.

What this document has to cover

This is access plus a biohazard plus a live animal issue, not a bit of facilities kit. A high-level cleaning RAMS that never mentions nest season, exclusion below or how you stop net becoming a trap will fail.

A bird netting rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Falls from the ledge or access equipment
  • Inhalation and infection from guano
  • Dropped fixings onto the public
  • Trapping a bird in a poorly tensioned net
  • Working over a lightwell someone still uses
  • Unknown coatings or asbestos on old ledges

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Check for active nests before you start — stop if the law and the client require it
  • Characterise guano; set COSHH and exclusion below
  • Access from the named system; lanyard tools
  • Fix net to the specified tension and mesh; no sagging pockets
  • Bag guano as waste; do not dry-sweep it off the ledge
  • Hand over inspection of the net so it cannot become a trap

Occupancy and other people

Lightwells over offices stay in use. Write the closed well and that a receptionist will send smokers into your drop zone.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Guano (biological)
  • Cleaning chemicals if washing
  • Fixing resins

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer bird netting rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this legal advice on wildlife?
No. If nests may be active, stop and get advice.
Spikes vs net?
Write the actual system — spikes change public and welfare issues.
Do I need rope access?
Only if that is the access — then attach that RAMS.
Who inspects the net later?
The client — your RAMS is this install.