Automatic sliding door RAMS
A powered door is machinery over a live threshold. A glass-install RAMS that never mentions activation zones, safety edges or how you keep an escape while the door is in hold-open will fail the building manager.
Typical scope
- Alternative entrance
- Operator isolated
- Glass lift plan
- Safety devices before auto-run
- Force/presence test
- Fire-hold explained to FM
Quick answer
An automatic sliding-door RAMS covers installing or replacing a powered sliding entrance on a named opening. The lift of glass, crushing on the leaves, and the public still using the entrance are the critical harms.
Primary topic: automatic sliding door rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Manual glass RAMS reused
No operator, no edges.
Auto-run to ‘see it’ with visitors in the arc
Crush.
Failed door left on a wedge overnight
Escape and security.
Example
Entrance pair on a live civic foyer
Built from one job description. You review and adjust every item before issuing it.
Job description
Replace the automatic sliding pair at Civic House, York, Sunday 07:00–13:00. Side door as the entrance, operator isolated, two-person glass lift, safety edges before any auto-run, force test, FM shown isolation and fire-hold.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Foyer, Civic House, York, report to the Civic House FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Civic House FM site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Edges before auto
Same idea as gates.
The opening is public
Marshal an alternative.
Fire-hold is a handover
FM must know it.
What this document has to cover
A powered door is machinery over a live threshold. A glass-install RAMS that never mentions activation zones, safety edges or how you keep an escape while the door is in hold-open will fail the building manager.
An automatic sliding door rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Dropped glass or operator during the lift
- Crushing or impact on a leaf in learn-and-run
- Electric shock on the operator
- Public walking an unguarded opening
- Escape compromised if the door is left in a failed state
- Work at height over the transom
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Agree whether the opening stays in use and set a marshalled alternative entrance
- Isolate the operator; support the existing leaves before unbolting
- Lift glass and operator with a planned lift — not a human chain on the mat
- Fit tracks, safety devices and activation; do not auto-run until edges are live
- Force and presence-test as specified
- Hand over isolation, fire-hold and the remaining defects
Occupancy and other people
Foyers keep trading. Write the alternative door and that a learn-and-run with visitors in the radius is a RAMS failure.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Grease on the operator
- Silicone on glass
- Cleaning solvents
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer automatic sliding door rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGlazing RAMSCreate curtain walling method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsGlazing method statementWrite a glazing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a roller shutter?
- No — pedestrian sliding glass and activation zones.
- Fire door interface?
- If it is on the fire system, write the hold-open and release.
- Can I use a glass-install RAMS?
- Add power, edges and the public threshold — better to use this.
- Who force-tests?
- Someone competent for powered pedestrian doors; keep the printout with the handover.