Automatic-door PPM RAMS

This is not a automatic sliding door RAMS. This job covers servicing an automatic door on a live entrance, and the control that keeps people safe is a pedestrian exclusion and isolation of the operator before anyone is in the leaf line. If the RAMS never names crush, remaining entrance and who still enters, a principal contractor will send it back.

Typical scope

  • A pedestrian exclusion and isolation of the operator before anyone is in the leaf line as a hold point
  • Crush, remaining entrance and who still enters named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A automatic-door ppm rams covers servicing an automatic door on a live entrance on a named UK site. The critical control is a pedestrian exclusion and isolation of the operator before anyone is in the leaf line. Write crush, remaining entrance and who still enters into the sequence — a pack that could describe any automatic sliding door RAMS will not survive a competent review.

Primary topic: automatic-door ppm rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • automatic sliding door RAMS reused

    Missing: a pedestrian exclusion and isolation of the operator before anyone is in the leaf line.

  • Critical control buried

    Crush, remaining entrance and who still enters belongs in the sequence.

  • Occupancy ignored

    Crush, remaining entrance and who still enters and that someone who did not read the pack will walk the exclusion.

Example

Automatic-door PPM on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Servicing an automatic door on a live entrance at Bay 2, Oswestry Depot, Oswestry. Night 21:00–05:30. A pedestrian exclusion and isolation of the operator before anyone is in the leaf line; crush, remaining entrance and who still enters; crush, remaining entrance and who still enters and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work
  • Lone working

Method (4 steps)

  1. 1.Arrive and sign in. Arrive at Bay 2, Oswestry Depot, Oswestry, report to the Oswestry Depot site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  4. 4.Hand over and sign out. Hand over to the Oswestry Depot site contact, report anything outstanding and sign out.

Main risks (1 in total)

Lone working

Residual Low

Who: Lone operatives

  • Higher-risk tasks (work at height, live work, confined spaces) not carried out alone
  • Check-in procedure agreed with the office at set times
  • Mobile phone charged and signal checked on arrival

What to get right on this document

Critical control first

Put this hold point first: a pedestrian exclusion and isolation of the operator before anyone is in the leaf line.

Name the site facts

Crush, remaining entrance and who still enters

People who did not read the pack

The named site stays in use around this automatic-door ppm job

What this document has to cover

This is not a automatic sliding door RAMS. This job covers servicing an automatic door on a live entrance, and the control that keeps people safe is a pedestrian exclusion and isolation of the operator before anyone is in the leaf line. If the RAMS never names crush, remaining entrance and who still enters, a principal contractor will send it back.

An automatic-door ppm rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if a pedestrian exclusion and isolation of the operator before anyone is in the leaf line is skipped on this automatic-door ppm job
  • Automatic-door PPM left open so a passer-by reaches the hazard
  • Wrong isolation so a sister automatic-door ppm stays live
  • Manual handling or dropped parts on this automatic-door ppm job
  • Weather, dust or a substance unique to servicing an automatic door on a live entrance
  • The next crew inheriting an open automatic-door ppm hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: a pedestrian exclusion and isolation of the operator before anyone is in the leaf line
  • Brief the dutyholder on crush, remaining entrance and who still enters
  • Set an exclusion that matches automatic sliding door RAMS failing on this site
  • Do the work to the sequence that keeps a pedestrian exclusion and isolation of the operator before anyone is in the leaf line first
  • Test or prove the critical control still holds
  • Handover residual automatic-door ppm hazards in writing

Occupancy and other people

The named site stays in use around this automatic-door ppm job. Write crush, remaining entrance and who still enters and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while servicing an automatic door on a live entrance
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer automatic-door ppm rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a automatic sliding door RAMS?
No. A automatic-door ppm RAMS has to name crush, remaining entrance and who still enters. A automatic sliding door RAMS will not survive a competent review.
Can we skip a pedestrian exclusion and isolation of the operator before anyone is in the leaf line?
No. A pedestrian exclusion and isolation of the operator before anyone is in the leaf line is the hold point. Write it before the work step.
Who writes crush, remaining entrance and who still enters?
The competent person who issues this automatic-door ppm rams. A sticky note is not a handover.
Can AI issue this automatic-door ppm rams?
A tool can draft a automatic-door ppm pack. A competent person reviews and issues it for this site.