Contractors search this because rewriting from a blank page every job is how weekends disappear. The useful outcome is a library you review, not a PDF you re-badge with a new site name.

On this page

  • Extract then review
  • Strip old names
  • Library as draft until accepted
  • Site facts added fresh
  • COSHH alongside, not SDS-as-COSHH
  • Issue after review

Quick answer

Importing existing RAMS means taking a Word or PDF pack you already use and turning the useful hazards, method steps and substances into library items you can reuse on the next named site. It is not a promise that the old file was adequate, and it is not legal advice.

Primary topic: import existing rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • PDF re-badged with a new address

    Not an import into a library.

  • Issued without reading the extract

    Old hospital name on a school job.

  • SDS zip file treated as COSHH

    Clients reject it.

What to get right on this document

Review is the method of import

Not trust the parser.

Library items start as drafts

You accept them.

SDS is not a COSHH assessment

Rebuild the task.

What this document has to cover

Contractors search this because rewriting from a blank page every job is how weekends disappear. The useful outcome is a library you review, not a PDF you re-badge with a new site name.

An import existing rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Old client or site names surviving into the next pack
  • Generic steps that never fitted the first job either
  • COSHH missing because the PDF only attached SDS files
  • Draft imports treated as issued without a competent review
  • Wrong trade or jurisdiction copied forward
  • Duplicate hazards that contradict each other

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Upload or paste the existing RAMS into the import flow
  • Check extracted activities, hazards and method steps against this job
  • Strip old client, site and date strings
  • Save accepted items to the company library as drafts until you review them
  • Generate the new site-specific pack from the library plus this site’s facts
  • Issue only after a competent person reviews and freezes the version

Occupancy and other people

The next site is occupied even if the last one was a vacant warehouse. Import does not copy occupancy; you still write who is in the building this week.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances mentioned in the old pack still need a task-based COSHH, not a re-attached SDS

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer import existing rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All guides · RAMS by trade · Free RAMS generator

Questions

Does import issue a RAMS automatically?
No. Import feeds a library and a draft. A competent person reviews and issues.
Can I import a generic template?
You can. You still have to make it site-specific before issue.
Will this mean an authority has endorsed the pack?
No. A tool does not endorse a pack, and using one does not transfer your duties.
What file types?
Follow the product import page — typically the text of Word/PDF packs you already own.