Lift engineer RAMS
Generic M&E RAMS miss the shaft. Landing control and lock-off have to be written.
Typical scope
- Out of service
- Lock-off
- Landing barrier
- Communication
- Manufacturer procedure
- Return test
Quick answer
A lift engineer RAMS is a site-specific pack for work in shafts, pits and machine spaces. Stored energy, falls and public landings are the point of the document.
Primary topic: lift engineer rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Tape on a landing
Not a control.
No lock-off
Car moves.
Lone with no check-in
No help.
Example
Breakdown in a shopping centre
Built from one job description. You review and adjust every item before issuing it.
Job description
Passenger lift 3 at Westgate Centre, Oxford. Out of service, landing barriers, lock-off, communication to a second person, return to service after test.
Activities identified
- General site work
- Electrical isolation
Method (7 steps)
- 1.Arrive and sign in. Arrive at Westgate Centre, Oxford, report to the Westgate FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
- 4.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
- 5.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the Westgate FM site contact, report anything outstanding and sign out.
Main risks (1 in total)
Electric shock or burns
Residual MediumWho: Operatives, building occupants
- Work carried out dead — no live working
- Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
- Only competent, qualified electricians carry out electrical work
- Permit to work obtained where the site requires one
- Personal locks and keys retained by the person working
What to get right on this document
Car cannot move
Lock-off named.
Physical landing control
Person or barrier.
Communication
Works in a shaft.
What this document has to cover
Generic M&E RAMS miss the shaft. Landing control and lock-off have to be written.
A lift engineer rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Fall into shaft
- Crushing
- Electric shock
- Lone work
- Pit restricted space
- Public at landings
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Take out of service
- Isolate/lock off
- Access car top or pit to procedure
- Task
- Test from safety
- Return to service
Occupancy and other people
Lobbies stay public. Tape is not a landing door.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Oils
- Hydraulic fluid
- Cleaners
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer lift engineer rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobLift maintenance RAMSCreate a lift maintenance rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- Method statementsPlantroom M&E method statementWrite a plantroom method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- RAMS by tradeHVAC RAMSCreate HVAC and refrigeration RAMS online: rooftop units, split systems, refrigerant recovery and brazing. Suggested risks and method steps you review before issue.
- RAMS by tradePlumbing RAMSCreate plumbing and heating RAMS online: boiler swaps, pipework, unvented cylinders and drain-downs. Suggested risks and method steps, reviewed by you.
- RAMS by tradeRoofing RAMSCreate a roofing RAMS online covering edge protection, fragile roofs, falling objects and weather. Suggested controls and method you review before issue.
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- RAMS by tradeFit-out RAMSCreate a fit-out or shopfitting RAMS online: partitions, ceilings, dust, occupied premises and out-of-hours work. Reviewed by you before issue.
Questions
- Install vs service?
- Install adds cranage and building interfaces — expand the RAMS.
- MRL lifts?
- Still isolation and crushing.
- Firefighting lifts?
- Client procedure may add steps — follow it.
- Trapped passenger on arrival?
- Rescue procedure first; maintenance RAMS starts after the car is safe.