RAMS by trade · UK
Drylining RAMS
Fit-out programmes hide drylining as ‘low risk’. Principal contractors still want cut-station COSHH and fire-stop ownership in writing.
Typical scope
- Extract at cut
- Fire-stop owner
- Stillage routes
- Access equipment
- Shared-floor brief
- Daily tidy
Quick answer
A drylining RAMS is a site-specific pack for metal stud, plasterboard, insulation and finishing. Dust, handling and fire-stopping should be obvious in the method.
Primary topic: drylining rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Mask-only COSHH
No extract.
Fire-stop by others with no name
Open penetrations.
Stilts unassessed
Falls.
Example
Boarding a live Cat-A floor
Built from one job description. You review and adjust every item before issuing it.
Job description
Dryline core walls on level 4 at Two Snowhill, Birmingham. Cut station on the loading dock, podiums, fire-stop as boarded, M&E in adjacent zones.
Activities identified
- General site work
- Ladders or stepladders
- Power tools
- Dust-generating work
Method (6 steps)
- 1.Arrive and sign in. Arrive at Level 4, Two Snowhill, Birmingham, report to the Two Snowhill Fit-out site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up access equipment. Inspect and set up the podium or stepladder on firm, level ground in the work area.
- 4.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Two Snowhill Fit-out site contact, report anything outstanding and sign out.
Main risks (4 in total)
Fall from ladders or stepladders
Residual MediumWho: Operatives
- Use a podium or mobile tower instead of a ladder where the task allows
- Ladders only for short-duration (under 30 minutes), light work with three points of contact
- Ladder inspected before use; industrial-grade (EN 131 professional) only
- Ladder set on firm, level ground and footed or secured
- No overreaching — move the ladder instead
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
Dust (including silica)
Residual MediumWho: Operatives, people nearby
- Use pre-formed holes, or methods that create less dust
- On-tool extraction (M- or H-class) or water suppression when cutting or drilling
- Clean up with an M-class vacuum — no dry sweeping
- Face-fit tested RPE (FFP3 or equivalent) worn
What to get right on this document
Extract then RPE
Hierarchy, not habit.
Name the fire-stop
Trade and stage.
Escape routes
Stillages out of stairs.
What this document has to cover
Fit-out programmes hide drylining as ‘low risk’. Principal contractors still want cut-station COSHH and fire-stop ownership in writing.
A drylining rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Gypsum and silica dust
- Manual handling of boards
- Work at height
- Fire-stopping gaps
- Stillages in escape routes
- Shared floors with M&E
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Protect the floor, set a cut station with extract
- Track and stud
- Board with named access equipment
- Fire-stop penetrations
- Hand over to finishers
- Clear stillages daily
Occupancy and other people
Cat-A floors often have other trades. Cut stations do not belong in the live stair.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Gypsum dust
- Mineral wool
- Joint compound
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer drylining rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobDrylining / partitioning RAMSCreate a drylining rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- RAMS by tradeHVAC RAMSCreate HVAC and refrigeration RAMS online: rooftop units, split systems, refrigerant recovery and brazing. Suggested risks and method steps you review before issue.
- RAMS by tradePlumbing RAMSCreate plumbing and heating RAMS online: boiler swaps, pipework, unvented cylinders and drain-downs. Suggested risks and method steps, reviewed by you.
- RAMS by tradeRoofing RAMSCreate a roofing RAMS online covering edge protection, fragile roofs, falling objects and weather. Suggested controls and method you review before issue.
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- RAMS by tradeFit-out RAMSCreate a fit-out or shopfitting RAMS online: partitions, ceilings, dust, occupied premises and out-of-hours work. Reviewed by you before issue.
Questions
- Is drylining always a RAMS?
- On commercial fit-out, yes in practice.
- Tape and joint separately?
- You can combine if COSHH and access are complete.
- MF ceilings?
- Add extra height risk or a separate job page.
- Occupied tenant next door?
- Write noise, dust and access hours.