RAMS by job · UK
Drylining / partitioning RAMS
Boarding looks low-risk until silica/gypsum dust, stillage handling and fire-stopping interfaces are missed. Principal contractors expect those in the RAMS.
Typical scope
- Cut station with extract
- Stillage routes
- Fire-stop responsibility
- Access equipment
- Escape routes kept clear
- Shift tidy
Quick answer
A drylining RAMS covers metal stud, boards, insulation and finishing in live or fit-out buildings. Cutting (dust), stillages, and occupied-floor interfaces are the usual gaps.
Primary topic: drylining rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Cutting in the open plan
No extract.
Stilts unassessed
Falls.
Fire-stop ‘later’
Never happens.
Example
Cat-A partitioning on a live floor
Built from one job description. You review and adjust every item before issuing it.
Job description
Install metal stud partitions on level 6 at One City Square, Leeds. Cut station in the loading bay with extract, podium work, fire-stop as we board, tenants on level 5 remaining in occupation.
Activities identified
- General site work
- Ladders or stepladders
- Manual handling
- Power tools
- Plant and vehicle movement
- Occupied premises or public areas
Method (9 steps)
- 1.Arrive and sign in. Arrive at Level 6, One City Square, Leeds, report to the One City Square FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Set up access equipment. Inspect and set up the podium or stepladder on firm, level ground in the work area.
- 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 6.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 7.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 8.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 9.Hand over and sign out. Hand over to the One City Square FM site contact, report anything outstanding and sign out.
Main risks (6 in total)
Fall from ladders or stepladders
Residual MediumWho: Operatives
- Use a podium or mobile tower instead of a ladder where the task allows
- Ladders only for short-duration (under 30 minutes), light work with three points of contact
- Ladder inspected before use; industrial-grade (EN 131 professional) only
- Ladder set on firm, level ground and footed or secured
- No overreaching — move the ladder instead
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
+ 2 more risks in the full RAMS.
What to get right on this document
Dust is COSHH
Extract at the cut, not a woolly ‘wear a mask’ only.
Who fire-stops?
Name it in the method.
Stillages in the stair
A housekeeping control, not a slogan.
What this document has to cover
Boarding looks low-risk until silica/gypsum dust, stillage handling and fire-stopping interfaces are missed. Principal contractors expect those in the RAMS.
A drylining rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Inhalable gypsum and silica dust from cutting
- Manual handling of boards and stillages
- Work at height on stilts or podiums
- Cuts from tracks and knives
- Fire-stopping left as ‘by others’
- Other trades in the same corridor
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Set out, protect floors and agree dust control (extract, cut station)
- Install track and studs
- Board with agreed access equipment — no informal stilts unless assessed
- Service penetrations fire-stopped as specified
- Tape/joint or hand over to finishers
- Clear offcuts the same day — stillages not left in escape routes
Occupancy and other people
Office floors stay partly live. Cut stations belong in a well-ventilated bay, not the occupied open-plan.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Gypsum dust
- Rock mineral wool
- Joint compounds
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer drylining rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeFit-out RAMSCreate a fit-out or shopfitting RAMS online: partitions, ceilings, dust, occupied premises and out-of-hours work. Reviewed by you before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Are stilts allowed?
- Only if your RAMS and insurer allow them; podiums are usually cleaner to justify.
- Do I need RPE?
- If extract cannot control dust, yes — based on the COSHH, not habit.
- Shared floors?
- Write the other-trade briefing and segregation.
- MF ceilings too?
- Add the extra height and grid-collapse risks or write a separate job RAMS.