Skip to content
SafeForJob

COSHH by substance · UK

White spirit COSHH assessment

Decorators’ habit is an open jar on the steps. That is the assessment that needs to change.

What this assessment usually covers

  • Lidded jars
  • Ventilation
  • Gloves
  • Rag bin
  • Occupier
  • No drains

Quick answer

A white spirit COSHH assessment covers cleaning and thinning with white spirit. Vapour in closed rooms, skin contact and rag fires with oils are the usual issues.

Primary topic: white spirit coshh. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Open jar on stairs

    Vapour and trips.

  • Rags in a plastic bag

    Fire.

  • Windows shut in winter

    No ventilation.

What to get right on this document

Lid

Simple control.

Rag bin

Fire.

Ventilate

Occupier.

What this document has to cover

Decorators’ habit is an open jar on the steps. That is the assessment that needs to change.

A white spirit coshh only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Vapour inhalation
  • Skin dermatitis
  • Fire of rags/vapour
  • Eye splash
  • Spills to drains

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Water-based alternative if the spec allows
  • Lidded containers, small quantities
  • Ventilate
  • Gloves
  • Rags in lidded metal bins
  • No pouring to drains

Occupancy and other people

Occupied homes: vapour lingers. Write ventilation and occupier brief.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • White spirit
  • Alkyd residues on rags

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer white spirit coshh document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All coshh by substance · RAMS by trade · Free RAMS generator

Questions

Low-odour white spirit?
Still a solvent — read that SDS.
Brush cleaning outside?
Better ventilation, still skin and spill.
Children in the house?
Store and occupy — write it.
Is it VOC?
Yes — ventilation and substitution still apply.