Mortar / cement COSHH assessment

Gloves left off ‘for dexterity’ are how bricklayers get cement burns.

What this assessment usually covers

  • Wet-cement gloves
  • Wash facilities
  • Mix dust
  • Eye protection
  • Chromium
  • Public splash

Quick answer

A mortar COSHH assessment covers cement-based mortars and grouts you mix or use. Chromium sensitisation, alkali burns and silica in some mixes should be in the assessment.

Primary topic: mortar coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • No wash point

    Burns untreated.

  • Dry mix thrown

    Dust cloud.

  • Ripped gloves kept on

    Soaked alkali.

What to get right on this document

Wash facilities

A control, not a welfare extra.

Gloves that survive wet cement

Specified.

Mix without a cloud

Method.

What this document has to cover

Gloves left off ‘for dexterity’ are how bricklayers get cement burns.

A mortar coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Alkali burns (wet cement)
  • Chromium sensitisation
  • Inhalable dust when mixing dry
  • Eye splash
  • Silica in some sands

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Prefer pre-batched if it reduces dust
  • Mix to minimise dust cloud
  • Gloves and skin cover suitable for wet cement
  • Eye protection when flicking mortar
  • Wash facilities on site — not ‘use the client’s loo maybe’
  • Change out of contaminated clothing

Occupancy and other people

Public elevations: splash on pedestrians is an occupancy/COSHH overlap.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Portland cement
  • Lime if in the mix
  • Plasticisers

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer mortar coshh assessment document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All coshh by substance · RAMS by trade · Free RAMS generator

Questions

Is this the same as concrete pour COSHH?
Related alkali burns; pours add pump/wagon issues in the RAMS.
Chromium-reduced cement?
Still burns — reduction is not zero risk.
Lime render?
Often more aggressive — assess the actual mix.
Goggles for flicking?
If there is splash, yes.