COSHH by substance · UK
Isopropanol COSHH assessment
Comms rooms treat IPA as water. A bottle on a live bus, an open wipe tub all day, and a comms-room door wedged for ‘ventilation’ are the assessment that needs to change.
What this assessment usually covers
- Lidded small quantity
- Ignition control
- Ventilate without defeating fire doors
- Repeated-use gloves
- Wipe vs spray named
- Spill away from live gear
Quick answer
An isopropanol (IPA) COSHH assessment covers wipe-cleaning of fibre, electrics and stainless on your job. Highly flammable vapour, skin defatting and use next to live equipment or a pilot light are typical. An SDS is not a COSHH assessment.
Primary topic: isopropanol coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Open tub all day on a PDU
Vapour and fire.
Acetone COSHH reused
Different flash point.
SDS only
No task.
What to get right on this document
Lids
Vapour and fire.
Name wipe vs spray
Exposure changes.
SDS informs COSHH
It is not COSHH.
What this document has to cover
Comms rooms treat IPA as water. A bottle on a live bus, an open wipe tub all day, and a comms-room door wedged for ‘ventilation’ are the assessment that needs to change.
An isopropanol coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Fire of vapour next to live electrics or hot works
- Inhalation in a small comms or plant room
- Skin dermatitis from repeated wipes
- Eye splash
- Spills into equipment
- Public or other trades in a ‘clean’ room smelling vapour
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Smallest quantity, lidded containers, no decant into drinks bottles
- No ignition — including still-hot work and some live equipment policies
- Ventilate without wedging a fire door as the only plan
- Gloves as SDS for repeated use
- Wipes in a controlled bin
- Task: wipe vs spray — spray is a different mist
Occupancy and other people
Live comms halls and theatres cannot have a fire on a wipe. Write ignition control and that cleaners are not your labour for ventilation.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Isopropanol
- Residue on wipes
- Any mixed solvent in the product
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer isopropanol coshh assessment document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- RAMS by jobComms room power RAMSCreate a comms room power rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- COSHH by substanceDiesel COSHH assessmentDraft a coshh assessment for diesel for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSilica dust COSHH assessmentDraft a silica dust coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceCement COSHH assessmentDraft a cement coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceR32 refrigerant COSHH assessmentDraft a r32 coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent adhesive COSHH assessmentDraft a solvent adhesive coshh for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent-based paint COSHH assessmentDraft a solvent paint coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
All coshh by substance · RAMS by trade · Free RAMS generator
Questions
- Is IPA the same as acetone?
- No.
- Is an SDS enough?
- No.
- Can I use it live in a rack?
- Follow the site electrical rules — ignition and drip onto a bus still belong here.
- Food factory wipes?
- Hygiene vs fire — write both.