COSHH by substance · UK
Hydraulic oil COSHH assessment
A diesel sheet misses injection injury from a pinhole. A grease sheet misses mist from a leaking pack. Write pressure, quantity and whether you are changing a hose on a live dock.
What this assessment usually covers
- Pressure locked out
- No hands on pinholes
- Spill kit
- Gloves and wash
- Mist in pits assessed
- Waste route
Quick answer
A hydraulic-oil COSHH assessment covers filling, breaking into or injecting from hydraulic systems on dock levellers, plant and lifts. Skin, oil mist, high-pressure injection, and slip/fire of spills are typical. An SDS is not a COSHH assessment.
Primary topic: hydraulic oil coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Diesel COSHH reused
Injection missed.
Felt for a leak with a palm
Injection injury.
SDS only
No pressure, no pit.
What to get right on this document
Injection is the harm that diesel sheets skip
Write it.
Isolation then break-in
Linked to the RAMS.
SDS ≠ COSHH
Task is the hose, the pit, the people.
What this document has to cover
A diesel sheet misses injection injury from a pinhole. A grease sheet misses mist from a leaking pack. Write pressure, quantity and whether you are changing a hose on a live dock.
A hydraulic oil coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- High-pressure injection into skin from a pinhole or a cracked hose
- Skin dermatitis from prolonged wetting
- Inhalation of oil mist
- Slips and fire of spills
- Pollution of drains
- Unexpected movement if pressure was not locked out
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Lock out pressure before you crack a fitting — COSHH sits on the RAMS isolation
- Treat pinholes as injection hazards; never find a leak with a hand
- Gloves as SDS; wash facilities
- Spill kit and drain seals; rags in lidded bins
- Ventilate if a pack is misting in a pit
- Waste oil as hazardous
Occupancy and other people
Live docks and plant rooms have people walking the spill. Write the closed door and that agency drivers will reverse to a cone line through an oil film.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Hydraulic oil as named (mineral vs biodegradable still needs an SDS)
- Oil mist from leaks
- Rags
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer hydraulic oil coshh assessment document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- RAMS by jobDock leveller RAMSCreate a dock leveller rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- COSHH by substanceDiesel COSHH assessmentDraft a coshh assessment for diesel for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSilica dust COSHH assessmentDraft a silica dust coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceCement COSHH assessmentDraft a cement coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceR32 refrigerant COSHH assessmentDraft a r32 coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent adhesive COSHH assessmentDraft a solvent adhesive coshh for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent-based paint COSHH assessmentDraft a solvent paint coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
All coshh by substance · RAMS by trade · Free RAMS generator
Questions
- Is biodegradable oil exempt?
- No — read that SDS and still assess injection and spill.
- Is an SDS enough?
- No.
- Dock leveller RAMS?
- Attach this COSHH.
- Medical response to injection?
- It is an emergency — follow first aid on the SDS and get urgent care; this page is not clinical advice.