COSHH by substance · UK
Epoxy resin COSHH assessment
A ‘paint’ COSHH that never mentions the hardener is wrong.
What this assessment usually covers
- Both SDS
- Skin cover
- Ventilation
- Exclusion during cure
- Mix ratios
- Hazardous waste
Quick answer
An epoxy resin COSHH assessment covers mixing and applying two-pack epoxies. Skin sensitisation, vapours during cure and leftover mixing vessels are the usual harms.
Primary topic: epoxy resin coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Cotton gloves
Soaked through.
One SDS only
Hardener missed.
Others walking the floor
No exclusion.
What to get right on this document
Two SDS
Resin and hardener.
Skin is the route
Specified gloves.
Cure time
Exclusion.
What this document has to cover
A ‘paint’ COSHH that never mentions the hardener is wrong.
An epoxy resin coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Skin sensitisation
- Vapour inhalation while curing
- Eye splash
- Heat in mixing
- Waste still reactive
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Read both SDS (resin and hardener)
- Mix in ventilated area, correct ratios
- Gloves and skin cover that the SDS specifies — not cotton
- Ventilate the room during cure
- Exclude other trades until tack-free
- Dispose of leftover as hazardous
Occupancy and other people
Flooring pours in occupied buildings need hours when others will not walk through tack.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Epoxy resin
- Hardener
- Cleaning solvents
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer epoxy resin coshh assessment document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- RAMS by jobFloor grinding RAMSCreate a floor grinding rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by tradeFlooring RAMSCreate floor preparation method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- COSHH by substanceDiesel COSHH assessmentDraft a coshh assessment for diesel for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSilica dust COSHH assessmentDraft a silica dust coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceCement COSHH assessmentDraft a cement coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceR32 refrigerant COSHH assessmentDraft a r32 coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent adhesive COSHH assessmentDraft a solvent adhesive coshh for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent-based paint COSHH assessmentDraft a solvent paint coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
All coshh by substance · RAMS by trade · Free RAMS generator
Questions
- Is epoxy isocyanate?
- Usually not — different chemistry; still a sensitiser.
- Floor grind first?
- Add silica for the grind.
- Small kits?
- Still COSHH — quantity is in the assessment.
- What gloves?
- What the SDS says, typically chemical-resistant, not nitrile-thin for long pours necessarily — follow SDS.