COSHH by substance · UK
Dichloromethane COSHH assessment
Many ‘paint stripper’ habits assume DCM is gone. If the SDS still lists it, assess it. Substitution is first; a mask-only story in a bathroom is not a hierarchy.
What this assessment usually covers
- Substitution first
- SDS-specified gloves
- Ventilation of small rooms
- Occupier brief
- Rag control
- Lead paint stop if unknown
Quick answer
A dichloromethane (methylene chloride) COSHH assessment covers paint strippers and some adhesives that still use DCM. Vapour in a small room, skin absorption and cardiac effects under heavy exposure are why a white-spirit sheet is the wrong document. An SDS is not a COSHH assessment.
Primary topic: dichloromethane coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
White-spirit COSHH reused
Wrong solvent.
Nitrile-thin gloves all afternoon
Breakthrough.
Family in the house, windows shut
Vapour.
What to get right on this document
Check the SDS for DCM
Do not assume it is gone.
Gloves from the SDS
Not the van default.
SDS ≠ COSHH
Assess this bathroom, this duration.
What this document has to cover
Many ‘paint stripper’ habits assume DCM is gone. If the SDS still lists it, assess it. Substitution is first; a mask-only story in a bathroom is not a hierarchy.
A dichloromethane coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Inhalation of vapour in bathrooms, plant rooms and voids
- Skin absorption through ordinary gloves
- Eye irritation and splash
- Fire of some formulations and of rags
- Use in a confined cupboards with no air
- Occupants in the rest of the dwelling
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Substitute a non-DCM stripper if the spec allows
- If you must use it: smallest quantity, ventilated, away from occupied rooms
- Gloves the SDS specifies — DCM goes through many disposables
- No use in a sealed bathroom with a family upstairs as the only plan
- Rags in lidded containers; no hot works adjacent
- Review whether the task can be off-site or mechanically stripped
Occupancy and other people
Occupied homes: vapour lingers and travels. Write ventilation and that a sleeping child upstairs is occupancy.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Dichloromethane
- Other solvents in the mix
- Stripped paint residue (may include lead — stop and survey)
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer dichloromethane coshh assessment document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- RAMS by jobMasonry painting RAMSCreate a masonry painting rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- COSHH by substanceDiesel COSHH assessmentDraft a coshh assessment for diesel for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSilica dust COSHH assessmentDraft a silica dust coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceCement COSHH assessmentDraft a cement coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceR32 refrigerant COSHH assessmentDraft a r32 coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent adhesive COSHH assessmentDraft a solvent adhesive coshh for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
- COSHH by substanceSolvent-based paint COSHH assessmentDraft a solvent paint coshh assessment for UK work. Start from the SDS, apply hierarchy of controls, review before issue.
All coshh by substance · RAMS by trade · Free RAMS generator
Questions
- Is DCM banned in all strippers?
- Rules change — read the SDS in your hand. This page is not legal advice.
- Is an SDS enough?
- No.
- Lead paint under the coat?
- Survey before you create a worse dust.
- Outdoor stripping?
- Better air, still skin and waste.