Skip to content
SafeForJob

COSHH by substance · UK

Calcium oxide (quicklime) COSHH assessment

A hydrated-lime sheet is the wrong story. If the assessment does not mention the violent reaction with water and who is downwind, it is not ready.

What this assessment usually covers

  • Product named from the SDS in your hand
  • The violent reaction with water and who is downwind
  • Hierarchy: substitute or extract before RPE
  • Wash facilities where the SDS requires them
  • Occupants briefed if they share the air
  • SDS informs COSHH — it does not replace it

Quick answer

A quicklime coshh assessment covers using quicklime or lime-stabilising soils on your job on your job. An SDS is not a COSHH assessment. Write the violent reaction with water and who is downwind — quantity, duration, who is exposed and the controls you will actually use.

Primary topic: quicklime coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • hydrated-lime sheet reused

    Wrong substance or task.

  • SDS PDF treated as the assessment

    Rejected.

  • Occupancy ignored

    The school-gate time and downwind houses

What to get right on this document

Name this product

From the SDS you have, not a sister sheet.

The task is the assessment

The violent reaction with water and who is downwind

SDS ≠ COSHH

Quantity, duration, who is exposed.

What this document has to cover

A hydrated-lime sheet is the wrong story. If the assessment does not mention the violent reaction with water and who is downwind, it is not ready.

A quicklime coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Thermal burns when water hits quicklime
  • Alkaline burns
  • Dust downwind of a soil-stabilise
  • Eye damage
  • Public at a highway verge
  • Confusion with hydrated lime

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Read that SDS — quicklime is not hydrated lime
  • Control water addition
  • Exclude downwind occupants
  • Eye and skin protection
  • Do not use on a windy verge next to a school gate
  • Wash facilities

Occupancy and other people

Highways stay public. Write the school-gate time and downwind houses.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Calcium oxide (quicklime)
  • Residues already on the substrate
  • Dilution or mix as actually used

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer quicklime coshh assessment document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All coshh by substance · RAMS by trade · Free RAMS generator

Questions

Is an SDS enough?
No. An SDS is an input to a quicklime coshh assessment, not the assessment.
Can I copy a hydrated-lime sheet?
No. Calcium oxide (quicklime) has its own SDS and this task is using quicklime or lime-stabilising soils on your job.
Who is exposed?
Write the violent reaction with water and who is downwind. Occupants count if they share the air.
Can AI issue this COSHH?
A tool can draft. A competent person reviews this calcium oxide (quicklime) assessment for this task.