Skip to content
SafeForJob

COSHH by substance · UK

Brick dust COSHH assessment

A silica sheet that never names the chase task is the wrong story. If the assessment does not mention the cut, extract and who is in the room, it is not ready.

What this assessment usually covers

  • Product named from the SDS in your hand
  • The cut, extract and who is in the room
  • Hierarchy: substitute or extract before RPE
  • Wash facilities where the SDS requires them
  • Occupants briefed if they share the air
  • SDS informs COSHH — it does not replace it

Quick answer

A brick dust coshh assessment covers cutting or chasing brick that generates dust, including silica if the SDS/product requires it on your job. An SDS is not a COSHH assessment. Write the cut, extract and who is in the room — quantity, duration, who is exposed and the controls you will actually use.

Primary topic: brick dust coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • silica sheet that never names the chase task reused

    Wrong substance or task.

  • SDS PDF treated as the assessment

    Rejected.

  • Occupancy ignored

    The closed bay and that a teacher will walk through

What to get right on this document

Name this product

From the SDS you have, not a sister sheet.

The task is the assessment

The cut, extract and who is in the room

SDS ≠ COSHH

Quantity, duration, who is exposed.

What this document has to cover

A silica sheet that never names the chase task is the wrong story. If the assessment does not mention the cut, extract and who is in the room, it is not ready.

A brick dust coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Inhalation of dust — silica if present
  • Eye injury from fragments
  • Dry cutting in an occupied corridor
  • Occupants returning to a dusty floor
  • Hearing and vibration as sister harms
  • Confusion with ‘just brick’

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Wet cut or on-tool extract
  • RPE as assessed if residual dust remains
  • Exclude the corridor
  • Do not dry-sweep
  • Read silica on that product/task
  • Clean as you go

Occupancy and other people

Corridors stay in use. Write the closed bay and that a teacher will walk through.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Brick dust
  • Residues already on the substrate
  • Dilution or mix as actually used

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer brick dust coshh assessment document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All coshh by substance · RAMS by trade · Free RAMS generator

Questions

Is an SDS enough?
No. An SDS is an input to a brick dust coshh assessment, not the assessment.
Can I copy a silica sheet that never names the chase task?
No. Brick dust has its own SDS and this task is cutting or chasing brick that generates dust, including silica if the SDS/product requires it.
Who is exposed?
Write the cut, extract and who is in the room. Occupants count if they share the air.
Can AI issue this COSHH?
A tool can draft. A competent person reviews this brick dust assessment for this task.