Acetone COSHH assessment

A ‘general solvents’ sheet that never mentions flash point fails a fire officer.

What this assessment usually covers

  • Quantity limited
  • Ignition control
  • Ventilation
  • Gloves
  • Lidded containers
  • Spill

Quick answer

An acetone COSHH assessment covers using acetone for cleaning or thinning. Highly flammable vapour, skin defatting and use in poorly ventilated rooms are typical.

Primary topic: acetone coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Open tray all day

    Vapour.

  • Used beside a boiler

    Ignition.

  • No spill plan

    Drains.

What to get right on this document

Lids

Vapour and fire.

Ignition sources

Named.

Ventilate small rooms

Or don’t use it there.

What this document has to cover

A ‘general solvents’ sheet that never mentions flash point fails a fire officer.

An acetone coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Fire/explosion of vapour
  • Inhalation
  • Skin defatting
  • Eye splash
  • Environmental spills

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Smallest quantity, lidded tins
  • No ignition, including still-hot works nearby
  • Ventilate
  • Gloves to SDS
  • Spill kit
  • Rags in lidded metal bins — they can self-heat with some oils but vapour is the acetone issue

Occupancy and other people

Small bathrooms and plant rooms concentrate vapour. Do not use acetone next to a pilot light.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Acetone

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer acetone coshh assessment document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All coshh by substance · RAMS by trade · Free RAMS generator

Questions

Is acetone the same as white spirit?
No — different flash point and controls.
Can I decant into a drinks bottle?
Never.
Hot works the same day?
Vapour and ignition — sequence them.
Waste rags?
Lidded, away from heat.