Spray painting method statement

Brush methods do not cover vapour or injection injury.

Typical scope

  • Permit
  • RPE
  • Gun safety
  • Watch
  • Detection back on
  • Waste

Quick answer

A spray painting method statement is the sequence for applying coatings by spray. Ignition sources, RPE, overspray exclusion and reinstating fire detection should be numbered steps.

Primary topic: spray painting method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Brush method reused

    No vapour.

  • Detection left off

    Fire.

  • Hand unblocking a gun

    Injection.

Example

Plant-room intumescent

Built from one job description. You review and adjust every item before issuing it.

Job description

Airless spray, air-fed RPE, detection permit, watch.

Activities identified

  • General site work

Method (4 steps)

  1. 1.Arrive and sign in. Arrive at Basement plant room, report to the FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  4. 4.Hand over and sign out. Hand over to the FM site contact, report anything outstanding and sign out.

Main risks (0 in total)

What to get right on this document

Name the product

COSHH.

Detection timed back on

Step.

Tip guard

Injection.

What this document has to cover

Brush methods do not cover vapour or injection injury.

A spray painting method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Fire/VOC
  • Isocyanates
  • Injection
  • Overspray
  • Detection isolated

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Isolate ignition and detection with permit
  • Ventilate and exclude
  • Spray with specified RPE and gun safety
  • Fire watch
  • Reinstate detection
  • Hazardous waste

Occupancy and other people

Neighbours’ cars and hotel guests are the overspray public.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Solvent coatings
  • Thinners
  • Isocyanates if used

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer spray painting method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All method statements · RAMS by trade · Free RAMS generator

Questions

Water-based?
Lighter fire risk, still overspray.
Outside?
Wind and cars.
Who writes COSHH?
You, from the SDS.
Hot works permit?
Usually detection/ignition permit instead.