Trial hole RAMS
A trial hole is a planned excavation, not a ‘quick dig with a shovel’. A vacuum-excavation RAMS that never mentions shoring of a hand-dug pit or how you plate a hole on a pavement overnight will fail.
Typical scope
- Service drawings and CAT
- Shoring when required
- Hand-dig at the service
- Hole plated when unattended
- Spoil off the footway
- Records before backfill
Quick answer
A trial-hole RAMS covers excavating inspection pits to find services or ground on a named site. Collapse, live services still in the hole, and the public at a street works are the critical harms.
Primary topic: trial hole rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Vacuum RAMS reused
Wrong tool story if you are hand-digging.
Hole left open ‘for the engineer tomorrow’
Unguarded.
Spoil dumped on the crossing
Public in the road.
Example
Service trial pits on a high street
Built from one job description. You review and adjust every item before issuing it.
Job description
Hand-dig three trial pits outside 22 High Street, Chester. NRSWA, CAT, hand-dig at the marked gas, shore at 1.2 m, spoil in a closed bay, pits plated overnight, shopfront open, records before backfill.
Activities identified
- General site work
- Excavation
- Outdoor or exposed work
Method (7 steps)
- 1.Arrive and sign in. Arrive at 22 High Street, Chester, report to the County Highways site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
- 4.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
- 5.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the County Highways site contact, report anything outstanding and sign out.
Main risks (3 in total)
Excavation collapse and falls into excavations
Residual MediumWho: Operatives, public
- Excavations battered back or supported (trench boxes/shoring) where people enter
- Spoil and plant kept away from the edge
- Edge protection and barriers around open excavations
- Excavations inspected at the start of each shift by a competent person
Striking buried services
Residual MediumWho: Operatives, public
- Service drawings obtained before digging
- Area scanned with a CAT and Genny by a trained operator; services marked
- Trial holes dug by hand near located services (safe digging practice)
Adverse weather
Residual LowWho: Operatives
- Forecast checked before work; work at height stopped in high winds
- Breaks, water and shade in hot weather; warm clothing in cold
- Sun protection on exposed work in summer
What to get right on this document
Treat it as an excavation
Shoring and CAT.
Plate it if you leave
No open hole.
The footway stays a footway
Spoil elsewhere.
What this document has to cover
A trial hole is a planned excavation, not a ‘quick dig with a shovel’. A vacuum-excavation RAMS that never mentions shoring of a hand-dug pit or how you plate a hole on a pavement overnight will fail.
A trial hole rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Excavation collapse on a deep pit
- Damage to live gas, electricity or fibre
- Public falling into an unplated hole
- Spoil on a footway forcing people into the road
- Contaminated ground not recognised
- Plant or a person in a pit with no rescue
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Permits, drawings and CAT before the first spit
- Set TM or exclusion; keep spoil off the footway line
- Dig by hand or vacuum at the service; shore if the depth requires it
- Do not use the pit as a workspace if it is a confined space
- Record, backfill or plate; never leave an open hole unguarded
- Reinstate the highway or garden
Occupancy and other people
High streets stay open. Write the boarded walkway and that a night-time unplated hole is a RAMS failure.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Possibly contaminated arisings
- Diesel if a vac unit is used
- Groundwater (not potable)
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer trial hole rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this vacuum excavation?
- Vac is a different tool. Use that RAMS if the unit is on site.
- Do I always shore?
- At the depth and ground the design requires — write it.
- Contaminated ground?
- Stop and characterise — do not mix arisings.
- Can I jump in to ‘feel the pipe’?
- Not if it is a confined space — assess it.