Traffic management RAMS
Cones are not a decoration. The RAMS should follow the agreed TM plan, including lookouts, lighting and weather.
Typical scope
- TM plan attached
- Setup order
- Night lighting
- Inspections
- Take-down reverse order
- Competence (NRSWA / LANTRA as required)
Quick answer
A traffic management RAMS covers setting out, maintaining and taking down TM on or next to live roads. Being struck by vehicles is the critical harm.
Primary topic: traffic management rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Plan not attached
Improvised cones.
Take-down casual
People in live lanes.
No night lighting
Invisible closure.
Example
Lane closure for ironworks
Built from one job description. You review and adjust every item before issuing it.
Job description
Two-way lights and a lane closure on the A61, Barnsley, 09:30–15:00. LANTRA TM, advanced signs first, night-equivalent lighting not required, take down in reverse, ironworks RAMS attached separately.
Activities identified
- General site work
- Electrical isolation
- Plant and vehicle movement
- Lone working
Method (7 steps)
- 1.Arrive and sign in. Arrive at A61, Barnsley, report to the County Highways site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
- 4.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
- 5.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the County Highways site contact, report anything outstanding and sign out.
Main risks (3 in total)
Electric shock or burns
Residual MediumWho: Operatives, building occupants
- Work carried out dead — no live working
- Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
- Only competent, qualified electricians carry out electrical work
- Permit to work obtained where the site requires one
- Personal locks and keys retained by the person working
Moving vehicles and plant
Residual MediumWho: Operatives, public, site staff
- Pedestrians segregated from vehicle and plant routes
- Plant operated by trained, authorised operators only
- Banksman used for reversing and manoeuvring
- High-visibility clothing worn
Lone working
Residual LowWho: Lone operatives
- Higher-risk tasks (work at height, live work, confined spaces) not carried out alone
- Check-in procedure agreed with the office at set times
- Mobile phone charged and signal checked on arrival
What to get right on this document
Setup is the danger
Protection before people.
Attach the drawing
The RAMS without the TM plan is incomplete.
Reverse take-down
Same discipline as setup.
What this document has to cover
Cones are not a decoration. The RAMS should follow the agreed TM plan, including lookouts, lighting and weather.
A traffic management rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Struck by vehicle
- Struck during setup (the highest-risk phase)
- Night work and poor lighting
- Manual handling of barriers
- Public stepping into live lanes
- Weather reducing visibility
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Brief the TM plan and radios
- Set advanced warning first, working in the shadow of protection
- Install the site, light it, inspect
- Maintain and log checks
- Take down in reverse, never turning your back to traffic unprotected
- Leave the highway clear
Occupancy and other people
The public includes cyclists and pedestrians who ignore cones. Write lookouts and, if needed, stop/go competence.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- None typically
- Paints if lining
- Diesel from plant sitting in the closure
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer traffic management rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeHighways RAMSCreate street works method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsStreet works method statementWrite a street works method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this instead of the ironworks RAMS?
- No — this is the live-road interface; the excavation still needs its own method.
- Short duration stops?
- Still a RAMS if people are on a live carriageway.
- Footway only?
- Pedestrian management still needs a plan.
- Emergency works?
- A dynamic assessment may start the job; this RAMS still needs to catch up.