RAMS by job · UK
Tower scaffold use RAMS
Towers tip, are used incomplete, or are moved with people on them. The RAMS should make those failure modes impossible to skip.
Typical scope
- Manufacturer sequence
- Ground and wind limits
- Tag/inspect
- No moving occupied
- Base exclusion
- Competence (PASMA or equivalent)
Quick answer
A mobile tower RAMS covers erecting, using, moving and dismantling a tower. Stability, guardrails before use, and ground conditions are the controls — not ‘operatives are trained’ as the only line.
Primary topic: mobile tower scaffold rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Erected incomplete
No guardrails to ‘save time’.
Moved with a person on it
Classic overturn.
Soft ground ignored
Base plates missing.
Example
Atrium lighting from a tower
Built from one job description. You review and adjust every item before issuing it.
Job description
Erect a 6 m mobile tower in the atrium at County Hall, Aylesbury, to replace luminaires. PASMA erector, advanced guardrail, exclusion at base during public opening hours, never moved occupied.
Activities identified
- General site work
- Mobile tower or scaffold
- Manual handling
- Occupied premises or public areas
Method (8 steps)
- 1.Arrive and sign in. Arrive at County Hall, Aylesbury, report to the Buckinghamshire FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
- 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 8.Hand over and sign out. Hand over to the Buckinghamshire FM site contact, report anything outstanding and sign out.
Main risks (4 in total)
Fall from tower or scaffold, or collapse
Residual MediumWho: Operatives, people nearby
- Mobile towers erected by PASMA-trained persons to the manufacturer's guide
- Scaffold erected by a competent scaffolder and tagged/inspected before use and every 7 days
- Guard rails, toe boards and brick guards in place on working platforms
- Castors locked and outriggers fitted; never moved while occupied
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
What to get right on this document
Sequence is the control
Manufacturer’s method, not improvisation.
Inspect every shift
Tag visible.
Competence named
Who is allowed to erect.
What this document has to cover
Towers tip, are used incomplete, or are moved with people on them. The RAMS should make those failure modes impossible to skip.
A mobile tower scaffold rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Collapse or overturn
- Falls during erection
- Moving a tower with people or materials on it
- Overhead services and weak ground
- Dropped tools
- Public walking into the base
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Check ground, wind and overheads; set out exclusion
- Erect in the manufacturer’s sequence with guardrails as specified (through-the-trap or advanced guardrail)
- Inspect and tag before first use each shift
- Use with wheels locked; never move occupied
- Dismantle in reverse sequence
- Store components so they cannot fall or block escape
Occupancy and other people
Inside occupied atria and outside on pavements both need a base exclusion. A tower is not a room divider.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- None typically unless cutting
- Oil on wheels if maintained
- Dust if used as a cutting platform — avoid that
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer mobile tower scaffold rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeScaffolding RAMSCreate scaffolding rams online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsScaffolding method statementWrite a scaffolding method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is PASMA legally required?
- The law requires competence; PASMA is the usual way to show it for towers.
- Indoor wind?
- HVAC and atrium doors still matter; follow the manufacturer.
- Can I use it on a slope?
- Only with the manufacturer’s kit and a new assessment.
- Tied towers?
- If you tie, write the ties — it is no longer a simple mobile tower.