You are working in toilets and bathrooms that stay in use. The RAMS should cover water isolation, hygiene, and not leaving a scalding outlet in service.

Typical scope

  • Specified set temperature
  • Phased WC availability
  • Flush and record
  • Healthcare hygiene
  • Isolation points
  • Dutyholder sign-back

Quick answer

A TMV installation RAMS covers fitting thermostatic mixing valves in healthcare, schools or housing. Scald prevention is the point of the job; legionella, isolation and occupied washrooms are the RAMS content.

Primary topic: tmv installation rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Setpoint not recorded

    Valve fitted, temperature unknown.

  • All WCs isolated

    No phasing.

  • Soldering RAMS only

    No scald or legionella content.

Example

Ward washroom TMVs

Built from one job description. You review and adjust every item before issuing it.

Job description

Fit TMVs to four wash-hand basins on Ward B at County Hospital, Lincoln. Work 21:00–06:00, keep one accessible WC live, set to 41 °C, record temperatures in the estates log.

Activities identified

  • General site work
  • Occupied premises or public areas

Method (5 steps)

  1. 1.Arrive and sign in. Arrive at Ward B, County Hospital, Lincoln, report to the County Hospital Estates site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  5. 5.Hand over and sign out. Hand over to the County Hospital Estates site contact, report anything outstanding and sign out.

Main risks (1 in total)

Members of the public and building occupants

Residual Low

Who: Public, customers, staff, residents

  • Work area segregated with barriers and clear signage
  • Work timed for quieter periods where possible, agreed with the site
  • Tools and materials never left unattended in public areas
  • Site contact informed of work areas and any disruption

What to get right on this document

Temperature is a control

Record the setpoint and the measured outlet.

Hygiene as written

Healthcare methods are not housing methods.

Do not leave a hot bypass

If you cannot commission, isolate the outlet.

What this document has to cover

You are working in toilets and bathrooms that stay in use. The RAMS should cover water isolation, hygiene, and not leaving a scalding outlet in service.

A tmv installation rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Scalding if a valve is left bypassed or unset
  • Water damage from isolation failures
  • Hygiene / infection control in healthcare
  • Work in small washrooms with the public nearby
  • Legionella if outlets are left stagnant
  • Needlestick or sharps in some premises

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Agree which outlets can be out of service
  • Isolate locally, drain and cap as needed
  • Install TMVs, set temperature to the specified range
  • Flush, measure and record outlet temperatures
  • Reinstate, clean and sign back to the dutyholder
  • Update any legionella log if required

Occupancy and other people

Hospitals and schools cannot lose all WCs. Phase the work and keep at least one accessible facility live unless the client agrees otherwise.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Disinfectants / wipes
  • Jointing compounds
  • Flux if soldering

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer tmv installation rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this a COSHH job?
Usually hygiene chemicals and maybe flux — attach what you use.
Do I need water hygiene competence?
Follow the client’s legionella scheme; the RAMS should not contradict it.
Can I do it during visiting hours?
Only if the method keeps patients and visitors out of the bay.
What temperature?
The specified range for the setting — typically ~38–41 °C at the outlet; write the actual spec.