RAMS by job · UK
Theatre dimmer rack RAMS
This is not a comms-room power RAMS. This job covers replacing or installing a dimmer or lighting-control rack in a live performance venue, and the control that keeps people safe is isolation of the rack and a dark-house brief before any bus is opened. If the RAMS never names which performance is cancelled or protected, the isolation point and who walks the grid, a principal contractor will send it back.
Typical scope
- Dark period agreed
- Rack proved dead
- Stage exclusion
- Emergency lighting restored
- Plot test
- Circuit schedule handed over
Quick answer
A theatre dimmer rack rams covers replacing or installing a dimmer or lighting-control rack in a live performance venue on a named UK site. The critical control is isolation of the rack and a dark-house brief before any bus is opened. Write which performance is cancelled or protected, the isolation point and who walks the grid into the sequence — a pack that could describe any comms-room power RAMS will not survive a competent review.
Primary topic: theatre dimmer rack rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Comms-room RAMS reused
No fly floor, no show.
Rehearsal still in
Live bus.
Emergency lighting left off
Dark escape.
Example
Dimmer swap between shows
Built from one job description. You review and adjust every item before issuing it.
Job description
Replace the dimmer rack at Lyceum Studio, Harrogate. Monday dark day, technical manager lock, rack proved dead, fly exclusion, emergency lighting on before 16:00 youth-theatre call.
Activities identified
- General site work
- Electrical isolation
- Manual handling
- Fire alarm or security systems
Method (11 steps)
- 1.Arrive and sign in. Arrive at Dimmer room, Lyceum Studio, Harrogate, report to the Lyceum Studio Trust site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
- 4.Agree fire system isolations. Agree with the responsible person which zones will be isolated and for how long. Put agreed fire-watch arrangements in place.
- 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 6.Install or replace devices. Install or replace detectors, sounders or security devices in the isolated zones.
- 7.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 8.Restore fire system. Restore all isolated zones, test the system, inform the responsible person and update the log book.
- 9.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
- 10.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 11.Hand over and sign out. Hand over to the Lyceum Studio Trust site contact, report anything outstanding and sign out.
Main risks (3 in total)
Electric shock or burns
Residual MediumWho: Operatives, building occupants
- Work carried out dead — no live working
- Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
- Only competent, qualified electricians carry out electrical work
- Permit to work obtained where the site requires one
- Personal locks and keys retained by the person working
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Fire alarm or protection out of service
Residual MediumWho: Building occupants
- Responsible person informed and isolations agreed before any part of the system is disabled
- Only the zones being worked on are isolated, for the shortest possible time
- Fire watch or alternative arrangements while protection is reduced
- System fully restored and tested before leaving; log book updated
What to get right on this document
The house is dark on purpose
Write who knows.
Emergency lighting is life safety
Restore it.
Students are occupancy
Out of the room.
What this document has to cover
This is not a comms-room power RAMS. This job covers replacing or installing a dimmer or lighting-control rack in a live performance venue, and the control that keeps people safe is isolation of the rack and a dark-house brief before any bus is opened. If the RAMS never names which performance is cancelled or protected, the isolation point and who walks the grid, a principal contractor will send it back.
A theatre dimmer rack rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Electric shock on a dimmer bus that is still live for a rehearsal
- Dropped tools from a fly floor onto the stage
- Dark-house falls on unmarked edges
- Show relay or emergency lighting isolated by mistake
- Pyrotechnic or scenery stored against the rack
- Audience or students arriving while covers are off
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Agree the dark period with the technical manager; isolate and prove dead the named rack
- Set exclusion on stage and fly; no students in the room
- Land or swap the rack; terminate and label
- Restore emergency lighting and show relay before anyone is invited back
- Test circuits to the plot — not a random bump
- Hand over the circuit schedule
Occupancy and other people
Theatres and school halls book around you. Write the cancelled rehearsal and that a caretaker will unlock for a parent tour.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Cleaning wipes on bus bars
- Dust from old dimmers
- Paint on rack frames
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer theatre dimmer rack rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a comms-room power job?
- Related energy. A theatre adds a fly floor, a plot and an audience calendar.
- Can a rehearsal stay in?
- Only if the exclusion holds and the rack is truly dead — write it.
- Who owns the plot?
- The technical manager. Do not invent channel numbers.
- Pyros in the store?
- Keep them away from the open rack — write the exclusion.