Temporary festoon lighting RAMS

This is not a temporary site power RAMS. This job covers rigging temporary festoon or task lighting for a shutdown or event, and the control that keeps people safe is a written route, RCD protection and a take-down before the public returns. If the RAMS never names where cables run, what they hang from and when the festoon comes down, a principal contractor will send it back.

Typical scope

  • Route drawn
  • RCD supply
  • Escapes clear
  • Daily inspect
  • Take-down time written
  • Not left as permanent

Quick answer

A temporary festoon lighting rams covers rigging temporary festoon or task lighting for a shutdown or event on a named UK site. The critical control is a written route, RCD protection and a take-down before the public returns. Write where cables run, what they hang from and when the festoon comes down into the sequence — a pack that could describe any temporary site power RAMS will not survive a competent review.

Primary topic: temporary festoon lighting rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Site-power RAMS reused

    No hanging line, no take-down.

  • Cable across a fire exit

    Escape lost.

  • Festoon still up on Monday

    A trip and a shock.

Example

Shutdown festoon in a hall

Built from one job description. You review and adjust every item before issuing it.

Job description

Rig festoon for a weekend floor grind at Staithes Hall, Whitby. Friday 18:00 hang, RCD board, no cable on the fire exit, daily inspect, take-down Sunday 16:00 before the Monday market.

Activities identified

  • General site work
  • Electrical isolation
  • Hot works
  • Power tools
  • Lone working

Method (10 steps)

  1. 1.Arrive and sign in. Arrive at Main hall, Staithes Hall, Whitby, report to the Staithes Hall Committee site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  4. 4.Obtain hot works permit. Obtain a hot works permit from the site. Remove or protect combustibles and place an extinguisher at the point of work.
  5. 5.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
  6. 6.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  7. 7.Braze joints. Braze joints under the hot works permit with nitrogen purge. Maintain the fire watch during and after the work.
  8. 8.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  9. 9.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  10. 10.Hand over and sign out. Hand over to the Staithes Hall Committee site contact, report anything outstanding and sign out.

Main risks (6 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

Fire from hot works

Residual Medium

Who: Operatives, building occupants

  • Use cold-work methods (press-fit, mechanical joints) instead of hot works where possible
  • Hot works permit obtained from the site before starting
  • Combustibles removed or protected with fire-resistant blankets
  • Suitable fire extinguisher at the point of work
  • Fire watch maintained during work and for at least 60 minutes after finishing
  • Fire-resistant gloves and eye/face protection

Fumes from hot works

Residual Medium

Who: Operatives, people nearby

  • Work in well-ventilated areas; local exhaust ventilation for welding
  • Keep the head out of the fume plume
  • Suitable RPE (face-fit tested) where ventilation isn't adequate

Hand and power tools

Residual Low

Who: Operatives

  • Battery or 110V tools used; no 230V tools on site without RCD protection
  • Tools inspected before use and PAT tested where applicable
  • Guards fitted and used as designed
  • Eye protection and gloves suitable for the task

+ 2 more risks in the full RAMS.

What to get right on this document

Take-down is a step

Write the hour.

RCD is the supply

Not a 4-way chain.

Escapes stay escapes

No cable.

What this document has to cover

This is not a temporary site power RAMS. This job covers rigging temporary festoon or task lighting for a shutdown or event, and the control that keeps people safe is a written route, RCD protection and a take-down before the public returns. If the RAMS never names where cables run, what they hang from and when the festoon comes down, a principal contractor will send it back.

A temporary festoon lighting rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Electric shock on damaged festoon in the wet
  • Trip on cables across an escape
  • Fire from overloaded 13 A tails used as a distribution
  • Dropped lamps from a hanging line
  • Public still in a ‘closed’ hall
  • Festoon left as a permanent install

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Draw the route; keep escapes clear; no cables across stairs
  • Supply from an RCD-protected distribution — not a daisy-chain of 4-ways
  • Hang from designed fixings; lamp cages on
  • Test and inspect daily while it is up
  • Take down before the public or the next trade needs the space
  • Hand over what remains and what was temporary

Occupancy and other people

Village halls and warehouses book the next event. Write the take-down time and that a caretaker will unlock for a Saturday market.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Lamp glass if broken
  • Cable-cleaning wipes
  • Tape residues

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer temporary festoon lighting rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this temporary site power?
Power may feed it. This RAMS is the hanging lighting and the take-down.
Can we leave it for the next trade?
Only if they accept it in writing. Default is take-down.
Outdoor festoon?
Add weather, height and public — do not copy an indoor method.
Who inspects daily?
The person named on the pack.