Structural welding RAMS

Welding in a live building is fire, fume and sometimes height. A ‘hot works’ RAMS that never names the weld process, the fire-watch duration, or how you stop fume entering occupied floors is thin.

Typical scope

  • Hot-works permit
  • LEV or forced ventilation
  • Screens
  • Fire watch duration
  • Occupancy briefing
  • Gas-bottle storage

Quick answer

A structural welding RAMS covers welding steel on a named site: hot works, fume, height or lift interface, and fire watch. The permit and the fume control are not optional lines.

Primary topic: structural welding rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Permit as a tick

    No watch after the arc.

  • Mild steel ‘doesn’t fume’

    It does — HSE expects control.

  • Welding in a timber frame with no screen

    Fire.

Example

Splices on a live warehouse frame

Built from one job description. You review and adjust every item before issuing it.

Job description

MMA splice welds at haunches on the Orion Fulfilment frame, Doncaster. Hot-works permit, LEV on the platform, screens, fire watch 60 minutes, picking continuing in the next aisle behind a hard exclusion, no burning of coated steel until surveyed.

Activities identified

  • General site work
  • Hot works
  • Fibre and data cabling

Method (8 steps)

  1. 1.Arrive and sign in. Arrive at Orion Fulfilment, Doncaster, report to the Orion Fulfilment site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Obtain hot works permit. Obtain a hot works permit from the site. Remove or protect combustibles and place an extinguisher at the point of work.
  4. 4.Install and splice fibre. Route and secure cables, then cleave and splice fibres. Dispose of offcuts in the sharps container.
  5. 5.Braze joints. Braze joints under the hot works permit with nitrogen purge. Maintain the fire watch during and after the work.
  6. 6.Test and commission. Test and commission the installation. Record results.
  7. 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  8. 8.Hand over and sign out. Hand over to the Orion Fulfilment site contact, report anything outstanding and sign out.

Main risks (3 in total)

Fire from hot works

Residual Medium

Who: Operatives, building occupants

  • Use cold-work methods (press-fit, mechanical joints) instead of hot works where possible
  • Hot works permit obtained from the site before starting
  • Combustibles removed or protected with fire-resistant blankets
  • Suitable fire extinguisher at the point of work
  • Fire watch maintained during work and for at least 60 minutes after finishing
  • Fire-resistant gloves and eye/face protection

Fumes from hot works

Residual Medium

Who: Operatives, people nearby

  • Work in well-ventilated areas; local exhaust ventilation for welding
  • Keep the head out of the fume plume
  • Suitable RPE (face-fit tested) where ventilation isn't adequate

Optical fibre — laser light and glass shards

Residual Low

Who: Engineers

  • Never look into fibre ends or connectors; treat all fibres as live
  • Fibre offcuts placed in a dedicated sharps container
  • Safety glasses worn when cleaving and splicing

What to get right on this document

Fume is COSHH

LEV, not just a mask habit.

Watch after the last arc

Named duration.

The WPS is the method

Process, not improvisation.

What this document has to cover

Welding in a live building is fire, fume and sometimes height. A ‘hot works’ RAMS that never names the weld process, the fire-watch duration, or how you stop fume entering occupied floors is thin.

A structural welding rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Fire from slag, spatter and leftover hot work
  • Inhalation of welding fume (including mild steel)
  • Electric shock and UV from the arc
  • Burns and eye injury to others in the bay
  • Work at height if welding in the steel
  • Hot works next to occupied wards, shops or timber stores

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hot-works permit, extinguishers, detection isolation if required, and a named fire watch
  • Set screens and local extract; keep occupied doors closed
  • Isolate other hazards (paint, timber, insulation) from the arc
  • Weld to the WPS; do not improvise a process
  • Fire watch for the specified duration after the last arc
  • Remove rods, stubs and gas bottles to storage

Occupancy and other people

Hospitals, shops and timber-frame plots stay occupied. Fume and fire detection isolation need a briefing of the people who still work next door.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Welding fume
  • Shielding gases (argon, CO2 mixes)
  • Anti-spatter aerosols
  • Paints if burning off existing coatings (stop for lead)

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer structural welding rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is mild-steel fume really a problem?
HSE expects welding fume to be controlled, including mild steel. This is not legal advice.
Do I need a separate hot-works RAMS?
You can combine if permit, watch and fume are full in this sequence.
Lead paint on old steel?
Stop and assess — do not burn it as a cleaning method.
Site vs workshop?
Workshop LEV still applies in spirit; on site you bring extract.