RAMS by job · UK
Solar thermal RAMS
Solar thermal is a wet, hot roof package, not PV. A rooftop-PV RAMS that never mentions glycol, scalding collectors or how you keep a cylinder in service will fail.
Typical scope
- Edge protection
- Glycol spill kit
- Same-day weathered penetrations
- Hot-water outage told
- Pressure test
- Fluid labelled
Quick answer
A solar-thermal RAMS covers fixing collectors on a named roof and connecting a glycol primary to a cylinder. Height, hot fluid, glycol COSHH and the family still needing hot water are the usual harms.
Primary topic: solar thermal rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
PV RAMS reused
No glycol, no scald.
Glycol to the gutter
Pollution.
Collectors left stagnating over a play area without a brief
Scald on a drain-down.
Example
On-roof collectors on an occupied house
Built from one job description. You review and adjust every item before issuing it.
Job description
Install two solar-thermal collectors at 9 The Grove, Cheltenham. Scaffold, glycol spill kit, cylinder isolated 10:00–15:00, family told, penetrations weathered same day, no drain to the gully, labels on the primary.
Activities identified
- General site work
- Mobile tower or scaffold
- Manual handling
- Plumbing and heating systems
- Solar PV and batteries
Method (12 steps)
- 1.Arrive and sign in. Arrive at 9 The Grove, Cheltenham, report to the Private homeowner site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Isolate and drain down. Isolate the water/heating supply, allow to cool and drain down the affected section. Confirm isolation before breaking into pipework.
- 4.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
- 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 6.Install mounting system and modules. Fix the mounting system to the roof structure, then install modules. Keep DC isolators open.
- 7.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 8.Install pipework. Install and connect pipework. Use press-fit or mechanical joints in place of hot works where possible.
- 9.Connect inverter and DC strings. Install the inverter and AC connection, then connect DC strings last with isolators open.
- 10.Test and commission. Test and commission the installation. Record results.
- 11.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 12.Hand over and sign out. Hand over to the Private homeowner site contact, report anything outstanding and sign out.
Main risks (6 in total)
Fall from tower or scaffold, or collapse
Residual MediumWho: Operatives, people nearby
- Mobile towers erected by PASMA-trained persons to the manufacturer's guide
- Scaffold erected by a competent scaffolder and tagged/inspected before use and every 7 days
- Guard rails, toe boards and brick guards in place on working platforms
- Castors locked and outriggers fitted; never moved while occupied
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Hot water, hot surfaces and flooding
Residual LowWho: Operatives, occupants
- System isolated, allowed to cool and drained down before work
- Isolation valves identified and tested before breaking into pipework
- Drip trays, buckets and wet vac available
- Gloves when handling recently isolated pipework
+ 2 more risks in the full RAMS.
What to get right on this document
It is a wet system
Glycol and pressure.
Collectors get hot
Treat drain-down as a scald task.
The family need hot water
Tell them.
What this document has to cover
Solar thermal is a wet, hot roof package, not PV. A rooftop-PV RAMS that never mentions glycol, scalding collectors or how you keep a cylinder in service will fail.
A solar thermal rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Falls from the roof or through a fragile covering
- Scald from a stagnating collector array
- Glycol spill to gutters and drains
- Manual handling of collectors on a pitch
- Electric shock on pumps and controls
- Building without hot water if the cylinder is isolated too long
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm roof access, edge protection and a spill route that is not a gully
- Isolate the cylinder circuit; brief the occupier on hot-water outage
- Fix collectors; do not leave an unweathered roof penetration
- Charge glycol with a spill kit; pressure-test
- Commission pump, vessel and controls; label the fluid
- Hand over stagnation and the do-not-drain-to-gully brief
Occupancy and other people
Homes stay lived in. Write the hot-water outage and that a glycol drip into a garden pond is a pollution incident.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Glycol / antifreeze
- Solders or compression compounds
- Roof sealants
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer solar thermal rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeSolar PV RAMSCreate solar pv rams online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsSolar PV method statementWrite a solar panel method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this rooftop PV?
- No — wet collectors and glycol, not DC modules.
- Can I reuse a heat-pump RAMS?
- Related hydronics, different roof and stagnation. Use this.
- Who owns the fluid?
- Label it — the next person should not drain to a gully.
- Drain-back vs glycol?
- Write the actual system.