RAMS by job · UK
Soakaway RAMS
A soakaway is a designed infiltration structure, not a hole full of rubble. A drainage-trench RAMS that never mentions percolation, silt traps or how you keep children out of an open pit will fail building control.
Typical scope
- Design and services first
- Shoring or batter
- Foul kept separate
- Silt trap as designed
- Pit guarded when unattended
- Spoil off the neighbour
Quick answer
A soakaway RAMS covers excavating and installing a crate or rubble soakaway on a named plot. Collapse, services, silt and not connecting a foul drain by mistake are the critical harms.
Primary topic: soakaway rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Trench RAMS reused
No infiltration design.
Foul tee’d in ‘because it was close’
Pollution.
Pit left open Saturday
A child in the hole.
Example
Crate soakaway on an occupied plot
Built from one job description. You review and adjust every item before issuing it.
Job description
Install a crate soakaway at Plot 7, Willow Beck, York. CAT, trench box, surface water only, silt trap as drawn, Heras overnight, spoil in the marked bay not the neighbour’s hedge, backfill Friday.
Activities identified
- General site work
- Manual handling
- Excavation
Method (9 steps)
- 1.Arrive and sign in. Arrive at Plot 7, Willow Beck, York, report to the Willow Beck Developments site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
- 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 5.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
- 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 7.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
- 8.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 9.Hand over and sign out. Hand over to the Willow Beck Developments site contact, report anything outstanding and sign out.
Main risks (3 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Excavation collapse and falls into excavations
Residual MediumWho: Operatives, public
- Excavations battered back or supported (trench boxes/shoring) where people enter
- Spoil and plant kept away from the edge
- Edge protection and barriers around open excavations
- Excavations inspected at the start of each shift by a competent person
Striking buried services
Residual MediumWho: Operatives, public
- Service drawings obtained before digging
- Area scanned with a CAT and Genny by a trained operator; services marked
- Trial holes dug by hand near located services (safe digging practice)
What to get right on this document
The design is percolation
Do not guess a size.
Foul never enters
Separate systems.
Guard the pit
Children are occupancy.
What this document has to cover
A soakaway is a designed infiltration structure, not a hole full of rubble. A drainage-trench RAMS that never mentions percolation, silt traps or how you keep children out of an open pit will fail building control.
A soakaway rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Excavation collapse
- Contact with buried services
- Children or residents in an open pit
- Silt blinding the crates on day one
- Wrong connection of foul into a soakaway
- Spoil and plant on a neighbour’s boundary
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm the design, percolation and service drawings before breaking ground
- Set exclusion and shoring or batter as designed
- Excavate; CAT as you go; keep spoil off the crates
- Install geotextile and crates; wrap as specified
- Connect only the specified surface-water runs; silt trap as designed
- Backfill, fence until settled, and do not leave a pit over a weekend unguarded
Occupancy and other people
Housing plots stay lived in. Write the fence and that a soakaway pit is not a den for the kids next door.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Geotextile and crate plastic (handling, not a COSHH story)
- Diesel from plant
- Silt (keep it out of the crates)
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer soakaway rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeDrainage contractor RAMSSite-specific drainage RAMS: collapse, services, gases and public highways.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this an attenuation tank?
- Attenuation stores and throttles; a soakaway infiltrates. Different design.
- Do I need a percolation test?
- If the design requires it, yes — do not dig blind.
- Can I use rubble?
- Only if specified — crates and rubble are different methods.
- Highway soakaway?
- Add NRSWA and the highway authority — do not copy a garden pit.