An AOV is life-safety ventilation, not a window. A smoke-extract-fan RAMS that never mentions actuators, rain sensors or how you keep a stair tenable during the works will fail the fire engineer.
Typical scope
- Outage strategy
- Access and exclusion
- Cause-and-effect as designed
- Weather as you go
- Interlocks commissioned
- No unagreed open shaft
Quick answer
A smoke-vent RAMS covers installing an AOV window, louver or roof vent on a named smoke-control system. Height, the fire-strategy interface and not leaving a shaft or stair without its vent are the critical controls.
Primary topic: smoke vent rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Window RAMS reused
No smoke panel.
Whole smoke system isolated
Building blind.
Roof vent left open overnight
Weather and strategy.
Example
Stair AOV on an occupied school
Built from one job description. You review and adjust every item before issuing it.
Job description
Install an AOV at the head of stair 2, Millfield Primary, Norwich, inset day. Responsible person agrees the stair is marshalled, MEWP, actuator as drawn, cause-and-effect witnessed, weathered same day, no overnight open shaft.
Activities identified
- General site work
- Working at height (MEWP)
- Manual handling
Method (8 steps)
- 1.Arrive and sign in. Arrive at Stair 2, Millfield Primary, Norwich, report to the Millfield Primary site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up exclusion zone below. Establish an exclusion zone below the work area with barriers and signage before any work at height starts.
- 4.Set up the MEWP. Check ground conditions, position the MEWP, deploy outriggers on spreader plates and complete pre-use checks.
- 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 8.Hand over and sign out. Hand over to the Millfield Primary site contact, report anything outstanding and sign out.
Main risks (3 in total)
Fall from height (MEWP)
Residual MediumWho: Operatives, people below
- MEWP used instead of ladders for access to the work area
- Operator holds a valid IPAF (or equivalent) licence for the machine category
- Pre-use checks completed and recorded; thorough examination (LOLER) in date
- Ground conditions checked; outriggers on spreader plates where required
- Ground-level rescue plan in place and a trained person at ground level
- Full-body harness with short work-restraint lanyard clipped to the basket anchor (boom MEWPs)
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
The strategy owns the outage
Named measure.
It must open on alarm
Commission the interface.
Weather the opening
Same day.
What this document has to cover
An AOV is life-safety ventilation, not a window. A smoke-extract-fan RAMS that never mentions actuators, rain sensors or how you keep a stair tenable during the works will fail the fire engineer.
A smoke vent rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Falls from the roof or a high opening
- Stair or atrium occupied without its designed vent
- Electric shock on actuators and 24 V/230 V supplies
- Dropped louver onto the public
- Wrong cause-and-effect so it will not open on alarm
- Weather entering an open shaft overnight
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Agree with the responsible person how smoke control is held during the outage
- Set access and exclusion below an elevation or roof
- Install the vent and actuator to the design; weather as you go
- Wire to the smoke-control panel; do not leave it in ‘hand’ overnight without agreement
- Commission open/close and rain/wind interlocks as specified
- Hand over and do not leave a shaft open
Occupancy and other people
Stairs stay in use. Write the compensation — a marshal or a restricted floor — and that a vent left on a wedge is not a method.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Sealants at the curb or frame
- Cleaning solvents on louvers
- Grease on actuators
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer smoke vent rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeFire & security RAMSCreate RAMS for fire alarm, CCTV and access control installation: system isolations, ceiling work, occupied buildings. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsFire alarm installation method statementWrite a fire alarm method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a smoke-extract fan?
- Fans are a different machine. This is a vent/AOV.
- Rain sensor closing on a fire?
- Follow the specified logic — do not invent it.
- Can I use a window-replacement RAMS?
- No — the smoke panel and strategy change the method.
- Who witnesses?
- The person who owns the smoke-control cause-and-effect — write their name on the RAMS.